• Shopping Cart
    There are no items in your cart

AISC 205 : 2011

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

AISC CERTIFICATION PROGRAM FOR STEEL BRIDGE FABRICATORS

Withdrawn date

01-04-2025

Published date

01-12-2013

Sorry this product is not available in your region.

1. Purpose
2. Program Scope and Fabricator Eligibility
3. References
4. Definitions
5. Management Responsibility
6. Contract and Project Specification Review and Communication
7. Detailing
8. Document and Data Control
9. Control of Quality Records
10. Purchasing
11. Material Identification and Traceability
12. Fabrication Process Control
13. Inspection and Testing
14. Calibration of Inspection, Measuring and Test Equipment
15. Control of Non conformances
16. Corrective Action
17. Handling, Storage and Delivery of Product and Materials
18. Training
19. Internal Audit
SUPPLEMENTAL REQUIREMENTS
I. Requirements for Fabricators of Intermediate Bridges
A. Requirements for Fabricators of Advanced Bridges
F. Requirements for Fabricators of Bridges with
   Fracture-Critical Members

Defines requirements for certification of facilities that fabricate and supply steel highway or railroad bridges.

DocumentType
Standard
PublisherName
American Institute of Steel Construction
Status
Withdrawn

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.