• There are no items in your cart

ISO 11929-2:2000

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by
withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Determination of the detection limit and decision threshold for ionizing radiation measurements Part 2: Fundamentals and application to counting measurements with the influence of sample treatment

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

02-15-2019

Language(s)

English, French

Published date

06-29-2000

DevelopmentNote
DRAFT ISO/DIS 11929-2 is also available for this standard. (09/2017)
DocumentType
Standard
Pages
16
PublisherName
International Organization for Standardization
Status
Withdrawn
SupersededBy

Standards Relationship
DIN 25482-6:1993-02 Identical
BS ISO 11929-2:2000 Identical

ISO 11929-7:2005 Determination of the detection limit and decision threshold for ionizing radiation measurements Part 7: Fundamentals and general applications
BS ISO 11929-7:2005 Determination of the detection limit and decision threshold for ionizing radiation measurements Fundamentals and general applications

DIN 25482-6:1993-02 LIMIT OF DETECTION AND LIMIT OF DECISION FOR NUCLEAR RADIATION MEASUREMENTS - COUNTING MEASUREMENTS WITH ALLOWANCE FOR THE INFLUENCE OF SAMPLE TREATMENT AND EQUIPMENT USED

View more information
US$73.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.