PREN 16704-1 : DRAFT 2014
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
RAILWAY APPLICATIONS - TRACK - SAFETY PROTECTION ON THE TRACK DURING WORK - PART 1: RAILWAY RISKS AND COMMON PRINCIPLES FOR PROTECTION OF FIXED AND MOBILE WORK SITES
12-01-2016
03-11-2014
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Common principles
5 Principles of risk assessment
6 Hierarchy of Safety Measures and parameters for the 5
railway risks
7 Working in tunnels
8 Designing infrastructure
9 Safety documentation and information
10 Use of personal protective equipment 10 Use of personal
protective equipment
Annex A (normative) - Requirements and conditions to manage
safety measures
Annex B (normative) - Parameters in risk assessment)
Annex C (informative) - Matrix of main responsibilities
Annex D (informative) - Noise level of machines
Annex E (informative) - Warning and remembering devices
Annex F (informative) - National speed limits for trains
approaching work sites
Annex G (informative) -Functions within the process 'warning'
Annex H (informative) - Format for safety plan on railway risks
Annex I (informative) - Guideline for the decision of blocking the
working track in relation to the use of hand-guided
machines/tools/equipment
Annex J (informative) - Process and documentation about
disconnection of overhead line
Annex K (informative) - Examples for the possibility to get
into the vicinity zone of the overhead
line system safety plan for railway risks
Annex L (informative) - Job descriptions of personnel
Annex M (informative) - Principal EU directives
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.