09/30202642 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS EN ISO 16484-1 - BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 1: PROJECT SPECIFICATION AND IMPLEMENTATION
Hardcopy , PDF
English
31-12-2010
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols, abbreviations and acronyms
5 Requirements
5.1 Overview
5.1.1 General
5.1.2 Phases of the BACS implementation process
5.1.3 Graphical overview
5.2 Design phase
5.2.1 General description
5.2.2 Definition of project requirements
5.2.3 Project plan and organization
5.2.4 Technical specification
5.2.5 Contract
5.3 Engineering phase
5.3.1 General description
5.3.2 Project plan and co-ordination details
5.3.3 Detailed hardware and function design
5.3.4 Approval of design submittals
5.3.5 Hardware configuration
5.3.6 Control strategy configuration
5.3.7 Management and operator function configuration
5.3.8 System test
5.4 Installation phase
5.4.1 General description
5.4.2 Installing
5.4.3 BACS vendor commissioning
5.5 Completion phase
5.5.1 General description
5.5.2 System demonstration
5.5.3 Operator instruction
5.5.4 Handover
5.5.5 Acceptance
5.5.6 Finalization
5.5.7 Completed
5.6 Documentation
5.6.1 General description
5.6.2 User documents
5.6.3 Datasheets
5.6.4 Operation and maintenance documents
5.7 Training
6 Review and improve building performance
Bibliography
BS EN ISO 16484-1
| Committee |
RHE/16
|
| DocumentType |
Draft
|
| Pages |
38
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| PREN ISO 16484-1 : DRAFT 2009 | Identical |
A newer version of this standard is available.
View Current Edition