AGA XR0104 : 2001
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
English
12-01-2013
01-10-2006
DISCLAIMER
FOREWORD
INTRODUCTION
CHAPTER I. PLASTIC PIPING MATERIALS
Kinds of Plastic Gas Piping Materials
Thermoplastics
Thermosetting Plastics
Properties of Thermoplastic and Thermosetting Plastics
Description of Piping Materials
Polyethylene (PE)
Properties of Polyethylene
Classification of Polyethylene Materials
Polyamide (Nylon)
Classification of Polyamide Materials
Polyamide 11
Properties of Polyamide Materials
Poly (Vinyl Chloride) (PVC)
Reinforced Epoxy Resin Pipe
New Plastic Pipe Materials For Piping and Molded Fittings
Factors Affecting the Performance of Plastic Piping
Materials
Engineering Properties of Plastic
Viscoelasticity
Creep
Stress Relaxation
Long-Term Strength
Rate Process Method to Validate LTS of PE Materials
Forecasting the Long-Term Strength of PE Fittings and
Joints
Additional Slow Crack Growth (SCG) Test Methods
Temperature Resistance
Chemical Resistance
Environmental Stress Crack Resistance (ESCR) for PE
Materials
Aging Resistance
Weather Resistance
External Loading
Rapid Crack Propagation
Flexibility
Impact Resistance
Permeability
CHAPTER II. ENGINEERING CONSIDERATIONS FOR PLASTIC PIPE
UTILIZATION
Introduction
Plastic Piping Systems
Federal Department of Transportation Regulations
Calculation of Design Pressure
Design Factor
Influence of Temperature on Selection of PE Pipe
System Wall Thickness
Influence of Temperature on Plastic Systems
Thermal Stress
Influence of Other Stresses on Plastic Piping Systems
Dimensions
Pipe
Tubing
Fittings .
Joints
Permeability of Polyethylene Pipe
Flow of Natural Gas in Plastic Pipe
Fully Turbulent Flow
Partially Turbulent Flow
CHAPTER III. PROCUREMENT CONSIDERATIONS AND ACCEPTANCE TESTS
Model Specification
Selection of Vendor
ASTM Standards and Test Methods
General
Material
Color
Workmanship
Dimensions and Tolerances
Pipe Length and Pipe Coils
Marking
Tests for Pipe Quality
User Qualification Testing
Procurement Control
User Acceptance Plan
Declaration of Compliance
Acceptance Testing
Monitoring Field Performance
Manufacturer Certification
CHAPTER IV. INSTALLATION OF PLASTIC PIPE
Shipping, Handling and Storage
Field Inspection Prior to Joining
Cutting
Plastic Joining Requirements
General Provisions
General Requirements
Qualification and Training
Adhesive Joints
Basic Joining Techniques
Solvent-Cement Joints
Solvent Cement
Basic Joining Techniques
Hot Plate Heat Fusion Joints
Socket Fusion
Socket-Fusion Joining
Butt Fusion
Butt-Fusion Joining
Saddle Fusion
Saddle-Fusion Joining
Fusion Using Different Resins
Electrofusion Joints
Electrofusion Couplings
Electrofusion Saddles
Mechanical Connectors and Transition Fittings
Mechanical Fittings
Flanges and Flange Adapters
Transition Fittings and Other Special Purpose Fittings
Service Connections
Main Connections
Service Head Adapters
Insert Service Risers (Anodeless Riser)
Provision for Valves
Avoiding Excessive Torque
Excess Flow Valves/Flow Limiters
Bends and Branches
External Stresses
Allowance for Linear Thermal Expansion and Contraction
Temperature Changes
Trenching and Backfilling
Pipe Placement In Trenches
Plowing Techniques
Plowing Methods
Pull-in Method
Plant-in Method
Trenchless Digging
Direct-Burial Requirements with Plastics
Mains
Services
Plastic Insertion of Mains and Services
General Considerations
General Requirements
Conventional Insertions
"LIVE" Insertions
Other Factors
CHAPTER V. PERSONNEL TRAINING, FIELD INSPECTION AND
PRESSURE TESTING
Personnel Training
Areas of Training
Typical Outline for Training
Field Inspection
Field Inspection Checklist
Inspection of Field Joints
Pressure Testing
Precautions in Testing
Pressure Tests
Capping Off
Joint Curing and Cooling
Soap or Bubble Checks
Leak Tracer
CHAPTER VI. MAINTENANCE, OPERATION AND EMERGENCY CONTROL
PROCEDURES
Performance of Plastic Piping Systems
Collection of Plastic Pipe Failures Data
Plastic Piping System Surveillance
Operating and Maintenance Code Requirements
Emergency Isolation
Static Electricity
Additional Precautions
Leakage Surveys
Pipe Locating
Chemical Environments
Rodent Damage
Repairs . .
Excess Flow Valves
Important Operating Precautions
APPENDICES
APPENDIX A. TEST METHODS AND PRACTICES FOR PLASTIC PIPES
APPENDIX B. GLOSSARY
APPENDIX C. OTHER SOURCES OF INFORMATION
APPENDIX D. MODEL SPECIFICATION FOR POLYETHYLENE PLASTIC
PIPE TUBING AND FITTING FOR NATURAL GAS
DISTRIBUTION
APPENDIX E. PLASTIC PIPE FAILURE REPORT FORM
APPENDIX F. SAMPLE-PLASTIC PIPE/FUSION INSPECTION CHECKLIST
APPENDIX G. NEW PLASTIC MATERIAL/PRODUCT EVALUATION
CHECKLIST
This standard describes: Technical descriptions of various plastic gas piping materials; Engineering considerations; Procurement considerations and acceptance tests; Installation considerations; Training, Field Inspection and Pressure testing; Maintenance, operation and emergency control procedures.
| DevelopmentNote |
Supersedes AGA XR9401. (09/2001) Supersedes AGA XR9401 1 and AGA XR9401 2. (06/2006)
|
| DocumentType |
Standard
|
| Pages |
0
|
| PublisherName |
American Gas Association
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |