Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

API MPM CH4.6 : 1999 : INC : ERR 1 : 2007(R2013)

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 4 - PROVING SYSTEMS - SECTION 6 - PULSE INTERPOLATION

Available format(s)

Hardcopy , PDF

Superseded date

29-10-2021

Language(s)

English

Published date

01-10-2013

0 INTRODUCTION
1 SCOPE
2 DEFINITIONS
3 REFERENCES
4 DOUBLE-CHRONOMETRY PULSE INTERPOLATION
  4.1 Conditions of Use
  4.2 Flowmeter Operating Requirements
5 ELECTRIC EQUIPMENT TESTING
6 FUNCTIONAL OPERATIONS TEST REQUIREMENTS
7 CERTIFICATION TEST
8 MANUFACTURER'S CERTIFICATION TESTS
APPENDIX A - PULSE-INTERPOLATION CALCULATIONS

Covers double-chronometry method for meter proving.

DocumentType
Standard
Pages
20
ProductNote
Reconfirmed 2013 This product is unavailable in Cuba, Iran, North Korea, Syria
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy
Supersedes

API MPM CH4.3 : 1988 MANUAL OF PETROLEUM MEASUREMENT STANDARDS - PROVING SYSTEMS - SMALL VOLUME PROVERS

View more information
$127.25
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more