AS/NZS 1518:2002
Current
The latest, up-to-date edition.
External extruded high-density polyethylene coating system for pipes (Reconfirmed 2016)
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
11-03-2002
Provides requirements for use by purchasers and manufacturers of steel pipeline systems, for external protection of pipeline systems against corrosion, by a method of annular or laterally extruded layer of high-density polyethylene over a sealant layer. Operating temperatures are in the range of -20 degrees Celsius to 55 degrees Celsius.
| Committee |
ME-038
|
| DocumentType |
Standard
|
| ISBN |
0 7337 4090 1
|
| Pages |
33
|
| ProductNote |
Reconfirmed 10/06/2016.This standard has been reconfirmed in Australia in 2016 and remains current in New Zealand. Reconfirmation Notice 10/06/2016
|
| PublisherName |
Standards Australia
|
| Status |
Current
|
| Supersedes |
This Standard specifies requirements for external protection against corrosion of pipeline systems, whereby a sealant layer is interposed between the pipe and the extrudate of high-density polyethylene, applied using annular or lateral extrusion techniques, to comprise the external coating.Materials complying with this Standard are intended for use where the pipe temperature during operation is in the range of -20°C to +55°C. Guidance is provided on selection and testing of the coating where elevated temperatures may be encountered during storage, stockpiling or construction. The performance of the coating at high and low temperatures may not be as reflected by tests carried out at ambient temperatures. For example, mastic creep and penetration, and coating system peel strength and cathodic disbonding resistance may not be as at ambient temperatures.The coating is intended for use in applications where it is not subject to weather or ultraviolet light exposure. A safe period of 12 months of weather exposure after manufacture is allowed for completion of the installation of the pipeline system.NOTES: 1 Guidelines for purchasers on information that should be supplied by the purchaser and those variables that should or may be agreed upon at the time of inquiry or order are given in Appendix A.2 For submerged arc welded pipe, additional consideration should be given to air entrapment along the length of the weld and localised stress on the polyethylene coating.Methods for demonstrating compliance with this Standard are given in Appendix B. Coatings applied over galvanized pipe shall comply with the requirements of Appendix C.
Originated as AS 1518-1979.
Jointly revised and designated AS/NZS 1518:2002.
Reissued incorporating Amendment No. 1 (May 2006).