BS 6046-4:1992

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Use of network techniques in project management Guide to resource analysis and cost control

Available format(s)

Hardcopy , PDF

Withdrawn date

15-06-1996

Language(s)

English

Published date

28-02-1992

Committees responsible
Foreword
Guide
0. Introduction
1. Scope
2. Definitions
3. General considerations
4. Resource analysis
5. Cost analysis of projects
Tables
1. Data used in the example given in figures 1 to 6
2. Review of resource analysis output
Figures
1. Example of early start aggregation of two resources
    (based on the data given in table 1)
2. Example of late start aggregation of two resources
    (based on the data given in table 1)
3. Example of cumulation of two resources (based on
    the data given in table 1)
4. Example of allocation of two resources with fixed
    resource limits (based on the data given in table 1)
5. Example of allocation of two resources with fixed
    time limit (based on the data given in table 1)
6. Example of smoothing two resources (based on the
    data given in table 1)
7. Cumulative cost curves
8. Use of hammock activity in network

Provides guidance on the use of these two techniques as a natural extension of the use of time analysis as a means of improving the management of projects.

Committee
MS/2
DevelopmentNote
Supersedes BS 6046: Pt4: 1981
DocumentType
Standard
Pages
36
PublisherName
British Standards Institution
Status
Withdrawn
Supersedes

BS 6046-3:1992 Use of network techniques in project management Guide to the use of computers
BS 5192-2:1993 Guide to production control Production programming
PD 3542:1991 The role of standards in company quality management
BS 3843-3:1992 Guide to terotechnology (the economic management of assets) Guide to the available techniques
BS 6046-2:1992 Use of network techniques in project management Guide to the use of graphical and project estimating techniques
BS 5192-1:1993 Guide to production control Introduction

BS 6046-2:1992 Use of network techniques in project management Guide to the use of graphical and project estimating techniques
BS 6046-1:1984 Use of network techniques in project management Guide to the use of management, planning, review and reporting procedures
BS 6046-3:1992 Use of network techniques in project management Guide to the use of computers

View more information
$407.85
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more