Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Wiring Rules bundle. AS/NZS 3000 + 3008.1.1 with 10% off already included. Shop Now

BS 6349-1-1:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Maritime works General. Code of practice for planning and design for operations

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

30-09-2013

Superseded date

30-10-2025

Superseded by

BS 6349-1-1:2025

$797.50
Including GST where applicable
Summarise this standard

Foreword
Section 1: General
1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviations
Section 2: The maritime environment
4 Environmental considerations
5 Bathymetric and topographic surveys
6 Meteorological and oceanographic considerations and
   data acquisition
7 Meteorological effects
8 Water levels
9 Currents and water movement
10 Waves
11 Water quality
12 Sediment transport
Section 3: Safety and operational considerations
13 Operational considerations for planning and design
14 Health and safety
15 Control of pollution and discharges to the sea
16 Port and maritime security
17 Design working life
18 Vessel data
19 Navigation channels and ship manoeuvring
20 Berths and mooring
21 Operability and weather downtime
22 Design operating conditions
23 Maintenance
Annexes
Annex A (informative) - Organizations with a role in coastal
        activities in the United Kingdom
Annex B (informative) - Metocean data acquisition
Annex C (informative) - Sediment transport data acquisition
Annex D (informative) - Key dimensions of ships for preliminary
        design purposes
Annex E (informative) - Guidance on assessment of acceptable
        wave conditions for moored vessels
Bibliography

Provides recommendations and guidance on general criteria relevant to the planning, design, construction and maintenance of structures and facilities set in the maritime environment. Also provides recommendations and guidance in respect of environmental and operational matters that need to be considered in planning and design of maritime works.

Committee
CB/502
DevelopmentNote
Supersedes 13/30250705 DC. (10/2013) Together with BS 6349-1-3(2012), BS 6349-1-4(2013) and BS 6349-1-2(2016), it supersedes BS 6349-1(2000). (06/2016)
DocumentType
Standard
Pages
120
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

This part of BS6349 gives recommendations and guidance on general criteria relevant to the planning, design, construction and maintenance of structures and facilities set in the maritime environment. It also gives recommendations and guidance in respect of environmental and operational matters that need to be considered in planning and design of maritime works.

It includes a description of the various physical environmental conditions that need to be considered for investigation at a coastal site, and gives information and guidance on methods of survey and data collection.

It is applicable to coastal, nearshore, estuarine and inland marine facilities for safe navigation, berthing, mooring, loading, unloading and servicing of ships, barges and other forms of waterborne transport and the associated infrastructure, equipment and works at the ship-shore interface. It is also applicable to other civil infrastructure works at the waterfront or coastal margin such as dredging, reclamation, shoreline and coastal management works and to recreational infrastructure such as marinas.

This part of BS6349 does not cover offshore structures for the petroleum and natural gas industries, which are specified in BSENISO19900 and BSENISO19901.

It does not cover recommendations for ground investigation, which are given in BS6349‑1‑3.

⚠

A newer version of this standard is available.

View Current Edition
$797.50
Including GST where applicable