Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS EN 61375-2-2:2012

Current

Current

The latest, up-to-date edition.

Electronic railway equipment. Train communication network (TCN) Wire Train Bus conformance testing

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

31-08-2012

$797.50
Including GST where applicable

INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions, Abbreviations, Conventions
4 Conformance test: approach, requirements
  and boundaries
5 Conformance test of a WTB node, WTB trunk
  cable, WTB jumper cables, WTB extension cables
6 Conformance test of RTP
7 Conformance test of a WTB-equipped consist
8 Conformance test of NM
Annex A (normative) - Test laboratory role
        and client role
Annex B (informative) - Test instrumentation
        and dedicated test bed
Bibliography
Annex ZA (normative) - Normative references
         to international publications with their
         corresponding European publications
Annex ZZ (informative) - Coverage of Essential
         Requirements of EU Directives

Pertains to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.

Committee
GEL/9
DevelopmentNote
Supersedes 09/30205450 DC. (08/2012)
DocumentType
Standard
Pages
106
PublisherName
British Standards Institution
Status
Current
Supersedes

This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.

The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations.

NOTE For a definition of TCN implementation see IEC 61375-2-1,1.3.

Standards Relationship
EN 61375-2-2:2012 Identical
IEC 61375-2-2:2012 Identical
I.S. EN 61375-2-2:2012 Equivalent
UNE-EN 61375-2-2:2012 Equivalent

ISO/IEC 9646-7:1995 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 7: Implementation Conformance Statements
UIC 556 : 5ED 2009 INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS)
ISO/IEC 9646-6:1994 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 6: Protocol profile test specification
ISO/IEC 9646-2:1994 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 2: Abstract Test Suite specification
ISO/IEC 9646-4:1994 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 4: Test realization
ISO/IEC 9646-5:1994 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 5: Requirements on test laboratories and clients for the conformance assessment process
EN 50155:2017 Railway applications - Rolling stock - Electronic equipment
IEC 61375-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture
IEC 60571:2012 Railway applications - Electronic equipment used on rolling stock
IEC 61375-2-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB)
ISO/IEC 9646-1:1994 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 1: General concepts
EN 61375-2-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB)
ISO/IEC 9646-3:1998 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 3: The Tree and Tabular Combined Notation (TTCN)

$797.50
Including GST where applicable