Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

CEI EN 62256 : 2009

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

HYDRAULIC TURBINES, STORAGE PUMPS AND PUMP-TURBINES - REHABILITATION AND PERFORMANCE IMPROVEMENT

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2009

Withdrawn date

24-01-2019

Superseded by

CEI EN 62256:2018

$444.04
Including GST where applicable
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and nomenclature
4 Reasons for rehabilitating
5 Phases of a rehabilitation project
6 Scheduling, cost analysis and risk analysis
7 Assessment and determination of scope of the work
8 Hydraulic design and performance testing options
9 Specifications
Annex A (informative) - Check-list for evaluation of existing
        turbine
Annex B (informative) - Assessment examples
Annex C (informative) - Checklist for evaluation of related
        equipment
Bibliography

Explains turbines, storage pumps and pump-turbines of all sizes and of the following types: - Francis; - Kaplan; - Propeller; - Pelton (turbines only); and Bulb turbines.

Committee
CT 4/5
DevelopmentNote
Classificazione CEI 4-11. (09/2009) 1ED 2009 Edition is valid until 04-07-2020. (02/2018)
DocumentType
Standard
Pages
136
PublisherName
Comitato Elettrotecnico Italiano
Status
Withdrawn
SupersededBy

Standards Relationship
EN 62256:2017 Identical
IEC 62256:2017 Identical

⚠

A newer version of this standard is available.

$444.04
Including GST where applicable