Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 02-527/1(2000) : 2000

Current

Current

The latest, up-to-date edition.

REQUIREMENTS FOR CABLES, ELECTRIC, FIRE SURVIVAL, HIGH TEMPERATURE ZONES AND LIMITED FIRE HAZARD SHEATHED CATEGORY 2

Available format(s)

PDF

Language(s)

English

Published date

01-04-2000

$31.16
Including GST where applicable

DevelopmentNote
This is a redesignation of NES 527. (01/2001) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purpose in support of existing in-service equipment. (04/2010)
DocumentType
Standard
Pages
64
PublisherName
UK Ministry of Defence Standards
Status
Current
Supersedes

DEFSTAN 02-517(PT5)/2(2008) : 2008 REQUIREMENTS FOR CABLE, ELECTRIC - PART 5: MISCELLANEOUS
DEFSTAN 07-247(PT1)/2(2006) : 2006 THE SELECTION OF MATERIALS ON THE BASIS OF THEIR FIRE CHARACTERISTICS - PART 1: SELECTION OF MATERIALS ON THE BASIS OF THEIR FIRE CHARACTERISTICS
DEFSTAN 02-357(PT3)/1(2003) : 2003 REQUIREMENTS FOR GASEOUS FIREFIGHTING SYSTEMS FOR MAIN MACHINERY SPACES AND COMPARTMENTS OF SURFACE SHIPS - PART 3: BCF (HALON 1211) SYSTEM
DEFSTAN 02-517(PT1)/2(2008) : 2008 REQUIREMENTS FOR CABLE, ELECTRIC - PART 1: PRESSURE-TIGHT ETHYLENE PROPYLENE RUBBER (EPR) OR SILICONE RUBBER INSULATED, CHLOROSULPHONATED POLYETHYLENE (CSP) LIMITED FIRE HAZARD (LFH) SHEATHED
DEFSTAN 02-357(PT1)/2(2009) : 2009 REQUIREMENTS FOR GASEOUS FIREFIGHTING SYSTEMS FOR MAIN AND AUXILIARY MACHINERY SPACES ON SURFACE SHIPS - PART 1: GENERAL REQUIREMENTS FOR CARBON DIOXIDE SYSTEMS
DEFSTAN 07-247(PT1)/3(2009) : 2009 THE SELECTION OF MATERIALS ON THE BASIS OF THEIR FIRE CHARACTERISTICS - PART 1: SELECTION OF MATERIALS ON THE BASIS OF THEIR FIRE CHARACTERISTICS
DEFSTAN 02-357(PT4)/1(2010) : 2010 REQUIREMENTS FOR GASEOUS FIREFIGHTING SYSTEMS FOR MAIN AND AUXILIARY MACHINERY SPACES ON SURFACE SHIPS - PART 4: GENERAL REQUIREMENTS FOR INERT GAS SYSTEMS INCLUDING ELECTRIC/ELECTRONIC SPACES
DEFSTAN 02-607/2(2008) : 2008 DESIGN OF HIGH VOLTAGE ELECTRICAL POWER SYSTEMS FOR HM SHIPS, SUBMARINES AND THE ROYAL FLEET AUXILIARY
DEFSTAN 02-512(PT6)/2(2002) : 2002 GUIDE TO CABLES, ELECTRICAL AND ASSOCIATED ITEMS - PART 6: CABLES, ELECTRICAL, MINIATURE, SUB-MINIATURE AND EQUIPMENT WIRES
DEFSTAN 02-512(PT1)/2(2002) : 2002 GUIDE TO CABLES, ELECTRICAL AND ASSOCIATED ITEMS - PART 1: GENERAL
DEFSTAN 02-512(PT2)/2(2003) : 2003 GUIDE TO CABLES, ELECTRICAL AND ASSOCIATED ITEMS - PART 2: CABLES, ELECTRICAL, SILICONE RUBBER INSULATED, LIMITED FIRE HAZARD OR CHLOROSULPHONATED POLYETHYLENE SHEATHED FOR GENERAL SERVICE
DEFSTAN 02-607/3(2013) : 2013 DESIGN OF HIGH VOLTAGE ELECTRICAL POWER SYSTEMS FOR HM SHIPS, SUBMARINES AND THE ROYAL FLEET AUXILIARY
DEFSTAN 02-512(PT12)/2(2002) : 2002 GUIDE TO CABLES, ELECTRICAL AND ASSOCIATED ITEMS - PART 12: INDEX TO NATO STOCK NUMBERS AND CABLES MANUFACTURING SPECIFICATIONS FOR CABLES LISTED IN PARTS 2-8
DEFSTAN 02-512(PT1)/3(2012) : 2012 GUIDE TO CABLES, ELECTRICAL AND ASSOCIATED ITEMS

$31.16
Including GST where applicable