Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 23-13(PT2)/1(2014) : 2014

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

GENERIC BASE ARCHITECTURE (GBA) - PART 2: POWER

Available format(s)

PDF

Language(s)

English

Published date

01-01-2014

Superseded date

27-02-2023

$31.16
Including GST where applicable

Foreword
Introduction
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Base Electrical Infrastructure
Annex A - Complete Base Power Infrastructure
Requirements
Annex B - Glossary

Defines the standards for the power, water, waste and fuel infrastructure in an operational base or headquarters and for the interfaces to it.

DevelopmentNote
Supersedes DEFSTAN 23-13/1(2012). (10/2014)
DocumentType
Standard
Pages
50
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

BS 7671(2008) : 2008 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - IET WIRING REGULATIONS
DEFSTAN 61-17/5(2009) : 2009 THE SELECTION AND INTRODUCTION OF BATTERIES AND FUEL CELLS FOR SERVICE USE
DEFSTAN 00-35/2(1996) : 1996 AMD 1 1997 ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL

$31.16
Including GST where applicable