Customer Support: 131 242

Your region & currency

Australia English(AU)

Pricing in AUD $

Local sites

  • Shopping Cart
    There are no items in your cart

We noticed you are browsing from United States. Switch to our United States site for local pricing in USD.

Dismiss alert
Wiring Rules bundle. AS/NZS 3000 + 3008.1.1 with 10% off already included. Shop Now

DIN 18125-1:2010-07

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SOIL, INVESTIGATION AND TESTING - DETERMINATION OF DENSITY OF SOIL - PART 1: LABORATORY TESTS

Published date

01-07-2010

Superseded date

01-03-2015

Sorry this product is not available in your region.
Summarise this standard

Vorwort
1 Anwendungsbereich
2 Normative Verweisungen
3 Definitionen
   3.1 Dichte des Bodens (Q)
   3.2 Trockendichte des Bodens (Q[d])
   3.3 Porenanteil (n)
   3.4 Porenzahl (e)
   3.5 Anteil der wassergefüllten Poren (n[w])
   3.6 Luftporenanteil (n[a])
   3.7 Sättigungszahl (S[r])
4 Bezeichnung
5 Probe
6 Grundlage des Verfahrens
7 Ermittlung der Masse der Probe
   7.1 Geräte
   7.2 Durchführung
8 Ermittlung des Volumens der feuchten Probe
   8.1 Grenzabweichungen
   8.2 Tauchwägung (Versuch DIN 18125 - LT)
        8.2.1 Geräte
        8.2.2 Proben
        8.2.3 Durchführung
        8.2.4 Auswertung
   8.3 Ausmessen der Probekörper (Versuch DIN 18125 - LA)
        8.3.1 Geräte
        8.3.2 Proben
        8.3.3 Durchführung
9 Angabe der Ergebnisse
10 Anwendungsbeispiele
   10.1 Beispiel 1
   10.2 Beispiel 2

This standard is included in DIN Handbook 376.

DocumentType
Standard
PublisherName
German Institute for Standardisation (Deutsches Institut für Normung)
Status
Superseded
SupersededBy

Sorry this product is not available in your region.