Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DIN EN 60512-4-3:2003-01

Current

Current

The latest, up-to-date edition.

CONNECTORS FOR ELECTRONIC EQUIPMENT - TESTS AND MEASUREMENTS - PART 4-3: VOLTAGE STRESS TESTS - TEST 4C: VOLTAGE PROOF OF PRE-INSULATED CRIMP BARRELS

Available format(s)

Hardcopy , PDF

Language(s)

German

Published date

01-01-2003

$69.17
Including GST where applicable

Foreword
1 Scope and object
2 Preparation of the specimen
3 Test method
4 Requirement
5 Details to be specified

Determines the ability of pre-insulated crimp barrels to withstand the crimp operation without damage to the insulation.

DevelopmentNote
Supersedes DIN IEC 48B-832-CD Partially supersedes DIN IEC 60512-2 (01/2003)
DocumentType
Standard
Pages
5
PublisherName
German Institute for Standardisation (Deutsches Institut für Normung)
Status
Current

Standards Relationship
BS EN 60512-4-3:2002 Identical
I.S. EN 60512-4-3:2002 Identical
EN 60512-4-3:2002 Identical
NF EN 60512-4-3 : 2002 Identical
IEC 60512-4-3:2002 Identical
UNE-EN 60512-4-3:2002 Identical

$69.17
Including GST where applicable