Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
5 Geotechnical investigation
6 Materials and products
7 Considerations related to design
8 Execution
9 Supervision, testing and monitoring
10 Records
11 Special requirements
Annex A (informative) - Glossary
Annex B (informative) - Control schedules during the
        execution
Annex C (informative) - Sample concreting record forms
        for diaphragm walls
Annex D (informative) - Degree of obligation of the provisions
Bibliography

This European Standard establishes general principles for the execution of diaphragm walls as either retaining walls or cut-off walls.

NOTE 1This standard covers only structures constructed in a trench excavated with a support fluid or in dry conditions, where soil is removed and replaced by concrete or slurry and with wall thickness B ≥ 40 cm.

NOTE 2Diaphragm walls can be permanent or temporary structures.

NOTE 3The following types of structure are considered:

a)retaining walls: usually constructed to support the sides of an excavation in the ground. They include:

1)cast in situ concrete diaphragm walls;

2)precast concrete diaphragm walls;

3)reinforced slurry walls;

b)cut-off walls: usually constructed to prevent migration of groundwater, clear or polluted, or of other contaminants present in the ground. They include:

1)slurry walls (possibly with membranes or sheet piles);

2)plastic concrete walls.

NOTE 4Walls formed shallow vertical trenches (typically excavations with a ratio of depth over thickness D/B < 5 or D < 5 m) are not covered by this standard.

Committee
CEN/TC 288
DevelopmentNote
Supersedes PREN 1538. (11/2010) 2010 Edition Re-Issued in June 2015 & incorporates AMD 1 2015. (06/2015)
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current
Supersedes

PREN 1536 : DRAFT 2008 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
BS EN 206 : 2013 CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
BS 8004:2015 Code of practice for foundations
DIN EN 206:2014-07 CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
08/30192723 DC : 0 BS EN 1536 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
DIN EN 1536:2015-10 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
I.S. EN 1536:2010 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
EN 206:2013+A1:2016 Concrete - Specification, performance, production and conformity
BS EN 1536 : 2010 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
EN 1536:2010+A1:2015 Execution of special geotechnical work - Bored piles
UNE-EN 1536:2011 Execution of special geotechnical work - Bored piles

EN 1536:2010+A1:2015 Execution of special geotechnical work - Bored piles
EN 10080:2005 Steel for the reinforcement of concrete - Weldable reinforcing steel - General
EN 791:1995+A1:2009 Drill rigs - Safety
EN 13670:2009 Execution of concrete structures
EN 206:2013+A1:2016 Concrete - Specification, performance, production and conformity

Sorry this product is not available in your region.