EN 61158-4-16:2008
Current
The latest, up-to-date edition.
Industrial communication networks - Fieldbus specifications - Part 4-16: Data-link layer protocol specification - Type 16 elements
29-02-2008
FOREWORD
INTRODUCTION
1 Scope
1.1 General
1.2 Specifications
1.3 Procedures
1.4 Applicability
1.5 Conformance
2 Normative references
3 Terms, definitions, symbols, abbreviations and
conventions
3.1 Reference model terms and definitions
3.2 Service convention terms and definitions
3.3 Other terms and definitions
3.4 Abbreviations
3.5 Symbols
3.6 DLPDU IDN concept
4 DL-protocol overview
5 Basic DLPDU structure
5.1 Overview
5.2 MST DLPDU
5.3 MDT DLPDU
5.4 AT DLPDU
6 Network management methods
6.1 Overview
6.2 Enable and disable cyclic communication
6.3 File transfer
6.4 Status procedures
7 Data transmission methods
7.1 Overview
7.2 SVC
7.3 RTC
8 DL management
8.1 Overview
8.2 Access to PhL
9 Error handling and monitoring
9.1 Invalid telegrams
9.2 Response to MDT and AT telegram failure
9.3 Reaction to handshake timeout
9.4 Service channel error messages
9.5 Reaction to error messages in the service channel
9.6 Error counters in the master and the slave
9.7 Error effects on communication phases
9.8 Monitoring in the master
9.9 Monitoring in the slave
Annex A (normative) - IDN - Identification numbers
A.1 IDN specification
A.2 Identification numbers in numerical orders
A.3 Detailed specification of communication-related
IDNs
Annex ZA (normative) Normative references to international
publications with their corresponding European
publications
Bibliography
It provides basic time-critical messaging communications between devices in an automation environment. This protocol provides communication opportunities to all participating data-link entities in a synchronously-starting cyclic manner, according to a pre-established schedule, and in a cyclic or acyclic asynchronous manner, as requested each cycle by each of those data-link entities. Thus this protocol can be characterized as one which provides cyclic and acyclic access asynchronously but with a synchronous restart of each cycle. It includes the following significant changes with respect to the previous edition deletion of the former Type 6 fieldbus, and the placeholder for a Type 5 fieldbus data-link layer, for lack of market relevance; addition of new types of fieldbuses; division of this part into multiple parts numbered.
| Committee |
CLC/TC 65X
|
| DevelopmentNote |
Together with EN 61158-4-17, EN 61158-4-18, EN 61158-4-19, EN 61158-4-4, EN 61158-4-7, EN 61158-4-8, EN 61158-4-11, EN 61158-4-12, EN 61158-4-13, EN 61158-4-14, EN 61158-4-2, EN 61158-4-3 and EN 61158-4-1 supersedes EN 61158-4. (05/2008) Together with EN 61158-6-16, EN 61800-7-304, EN 61800-7-1, EN 61800-7-204, EN 61158-5-16, EN 61158-2, EN 61784-1 and EN 61158-3-16 supersedes EN 61491. (09/2008)
|
| DocumentType |
Standard
|
| PublisherName |
European Committee for Standards - Electrical
|
| Status |
Current
|
| Supersedes |
| Standards | Relationship |
| IEC 61158-4-16:2007 | Identical |
| NF EN 61158-4-16 : 2016 | Identical |
| NBN EN 61158-4-16 : 2008 | Identical |
| NEN EN IEC 61158-4-16 : 2008 | Identical |
| I.S. EN 61158-4-16:2008 | Identical |
| PN EN 61158-4-16 : 2008 | Identical |
| BS EN 61158-4-16:2008 | Identical |
| CEI EN 61158-4-16 : 2008 | Identical |
| DIN EN 61158-4-16:2008-09 | Identical |
| UNE-EN 61158-4-16:2008 | Identical |