Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

EN 61850-7-1:2011

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models

Published date

14-10-2011

Superseded date

21-10-2020

Sorry this product is not available in your region.
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overview of the IEC 61850 series concepts
6 Modelling approach of the IEC 61850 series
7 Application view
8 Device view
9 Communication view
10 Where physical devices, application models
   and communication meet
11 Relationships between IEC 61850-7-2,
   IEC 61850-7-3 and IEC 61850-7-4
12 Formal specification method
13 Name spaces
14 Common rules for new version of classes and
   for extension of classes
Annex A (informative) - Overview of logical nodes
        and data
Annex B (informative) - Allocation of data to logical
        nodes
Annex C (informative) - Use of the substation
        configuration language (SCL)
Annex D (informative) - Applying the LN concept
        to options for future extensions
Annex E (informative) - Relation between logical
        nodes and PICOMs
Annex F (informative) - Mapping the ACSI to real
        communication systems
Bibliography
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for: - substation-specific information models for power utility automation systems, - device functions used for power utility automation purposes, and - communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces: - the model for statistical and historical statistical data, - the concepts of proxies, gateways, LD hierarchy and LN inputs, - the model for time synchronisation, - the concepts behind different testing facilities, - the extended logging function. It also clarifies certain items.

Committee
CLC/TC 57
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded

Sorry this product is not available in your region.