Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

EN 61850-7-410:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Published date

18-01-2013

Superseded date

19-02-2020

Sorry this product is not available in your region.

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Committee
CLC/TC 57
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy

Standards Relationship
IEC 61850-7-410:2012 Identical
BS EN 61850-7-410 : 2013 Equivalent
DIN EN 61850-7-410:2013-10 Equivalent
I.S. EN 61850-7-410:2013 Equivalent
UNE-EN 61850-7-410:2013 Identical

Sorry this product is not available in your region.