Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

EN 62058-11:2010

Current

Current

The latest, up-to-date edition.

Electricity metering equipment (a.c.) - Acceptance inspection - Part 11: General acceptance inspection methods

Published date

25-06-2010

Sorry this product is not available in your region.
Summarise this standard

INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviations
5 General
6 100% inspection
7 Lot-by-lot inspection by attributes
8 Isolated lot inspection
9 Skip-lot inspection
10 Lot-by-lot inspection by variables
Annex A (normative) Random numbers
Annex B (normative) Procedure for obtaining s or sigma
Bibliography
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications
Annex ZZ (informative) - Coverage of Essential
         Requirements of EC Directives

IEC 62058-11:2008 specifies the general acceptance inspection methods which apply to newly manufactured electricity meters produced and supplied in lots of 50 and above.

Committee
CLC/TC 13
DevelopmentNote
Together with EN 62058-21 supersedes EN 60514. Together with EN 62058-31 supersedes EN 61358. (07/2010)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current
Supersedes

Sorry this product is not available in your region.