Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

EN 62439-6:2010

Current

Current

The latest, up-to-date edition.

Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)

Published date

19-03-2010

Sorry this product is not available in your region.
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations, acronyms,
  and conventions
4 Overview
5 DRP communications
6 DRP class specification
7 DRP attributes
8 DRP services
9 DRP protocol specification
Bibliography
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

IEC 62439-6:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a recovery protocol based on a ring topology, designed to react deterministically on a single failure of an inter-switch link or switch in the network. Each switch has equal management role in the network. Double rings are supported. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008): - adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), - adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol), - moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents, - moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes, - moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes, - moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and - moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes, - adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8, - adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and - introducing the DRP protocol as IEC 62439-6.

Committee
CLC/TC 65X
DevelopmentNote
Together with EN 62439-1, EN 62439-2, EN 62439-3, EN 62439-4 and EN 62439-5 supersedes EN 62439. (04/2010)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current
Supersedes

Standards Relationship
IEC 62439-6:2010 Identical
DIN EN 62439-6:2010-09 Identical
I.S. EN 62439-6:2010 Identical
CEI EN 62439-6 : 2011 Identical
NF EN 62439-6 : 2013 Identical
BS EN 62439-6:2010 Identical
NEN EN IEC 62439-6 : 2010 Identical
UNE-EN 62439-6:2010 Identical

Sorry this product is not available in your region.