Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Wiring Rules bundle. AS/NZS 3000 + 3008.1.1 with 10% off already included. Shop Now

EN ISO 5667-13:2011

Current

Current

The latest, up-to-date edition.

Water quality - Sampling - Part 13: Guidance on sampling of sludges (ISO 5667-13:2011)

Published date

01-05-2011

Sorry this product is not available in your region.
Summarise this standard

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Developing a sampling plan
5 Sampling equipment and containers
6 Sampling procedure
7 Sample storage
8 Safety
9 Labelling and reporting
Annex A (informative) - Support on the selection of equipment
Annex B (informative) - Vacuum sampling devices
Annex C (informative) - Apparatus for sampling from pipes
        under pressure
Annex D (informative) - Minimum number of samples in a
        composite sample - Calculation example
Bibliography

ISO 5667-13:2011 gives guidance on the sampling of sludges from wastewater treatment works, water treatment works and industrial processes. It is applicable to all types of sludge arising from these works and also to sludges of similar characteristics, e.g. septic tank sludges. Guidance is also given on the design of sampling programmes and techniques for the collection of samples.

Committee
CEN/TC 308
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current

Sorry this product is not available in your region.