Customer Support: 131 242

Your region & currency

Australia English(AU)

Pricing in AUD $

Local sites

  • Shopping Cart
    There are no items in your cart

We noticed you are browsing from United States. Switch to our United States site for local pricing in USD.

Dismiss alert
Wiring Rules bundle. AS/NZS 3000 + 3008.1.1 with 10% off already included. Shop Now

ENA G99/NI ISSUE 1:2019

Current

Current

The latest, up-to-date edition.

Requirements for the connection of generation equipment in parallel with public distribution networks in Northern Ireland on or after 27 April 2019

Published date

01-04-2019

Sorry this product is not available in your region.
Summarise this standard

The purpose of this Engineering Recommendation (EREC) is to provide requirements for the connection of Power Generating Facilities to the Distribution Network of the licensed Distribution Network Operator (DNO).

DevelopmentNote
New child AMD 9 2022 is now added New child AMD 10 2024 is now added
DocumentType
Standard
ProductNote
New child AMD 9 2022 is now added New child AMD 10 2024 is now added
PublisherName
Energy Networks Association (UK)
Status
Current

Sorry this product is not available in your region.