ESI 41-8 : ISSUE 1

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

132kV COMPACT TRANSFORMER FEEDER SUBSTATIONS

Published date

12-01-2013

Superseded date

23-07-2013

Superseded by

ENA TS 41-8 : ISSUE 1

Sorry this product is not available in your region.

Covers the design and layout of 132kV outdoor compact feeder substations with up to 3 step down transformers, 132kV disconnectors and 132kV earthing switches.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Superseded
SupersededBy

ESI 41-15 PT 9 : ISSUE 1 AC TRACTION SUPPLIES TO BRITISH RAIL
ESI 41-15 PT 3 : ISSUE 1 ARRANGEMENTS FOR LOCALLY BANKING TWO TRANSFORMERS. TRANSFORMER END OF A TRANSFORMER-FEEDER
ESI 41-11 : ISSUE 2 AMD 1 TUBULAR ALUMINIUM BUSBARS, CONNECTIONS AND TERMINAL FITTINGS FOR 132kV OUTDOOR SUBSTATIONS
ESI 41-7 : ISSUE 1 132kV OUTDOOR SUBSTATIONS EXTENSIBLE UP TO FOUR SWITCH MESH
ESI 41-15 PT 2 : ISSUE 1 STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132KV SUBSTATIONS - TRANSFORMER FEEDER TRANSFORMER END 132/11/11KV DUAL SECONDARY
ESI 41-15 PT 1 : ISSUE 1 STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132KV SUBSTATIONS - TRANSFORMER FEEDER TRANSFORMER END

ESI 41-6 : ISSUE 1 132kV OUTDOOR BUSBAR TYPE SUBSTATIONS WITH ALUMINIUM CONNECTIONS
ESI 41-10 : ISSUE 3 SWITCHGEAR FOR USE ON 66, 132, 275 AND 400kV SYSTEMS
ESI 41-7 : ISSUE 1 132kV OUTDOOR SUBSTATIONS EXTENSIBLE UP TO FOUR SWITCH MESH
ESI 41-11 : ISSUE 2 AMD 1 TUBULAR ALUMINIUM BUSBARS, CONNECTIONS AND TERMINAL FITTINGS FOR 132kV OUTDOOR SUBSTATIONS

Sorry this product is not available in your region.