FM 5519 : 2001
Current
The latest, up-to-date edition.
ANTI-FREEZE SOLUTIONS FOR SPRINKLER SYSTEMS IN ENVIRONMENTS SUBJECT TO FREEZING
12-01-2013
1. INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Basis for Requirements
1.4 Basis for FM Approval
1.5 Basis for Continued Approval
1.6 Effective Date
1.7 System of Units
1.8 Applicable Documents
1.9 Definitions
2. GENERAL INFORMATION
2.1 Product Information
2.2 Approval Application Requirements
2.3 Requirements for Samples for Examination
3. GENERAL REQUIREMENTS
3.1 Review of Documentation
3.2 Markings
3.3 Manufacturer's Installation and Operation Instructions
3.4 Calibration
4. PERFORMANCE REQUIREMENTS
4.1 Fire Extinguishing Effectiveness
4.2 Uniform Corrosion
4.3 Stress Corrosion
4.4 Pitting Corrosion
4.5 Specific Gravity
4.6 Viscosity/Onset of Freezing Point/Maximum Melting Point
4.7 pH Test
4.8 Sodium Content
4.9 Chloride Content
4.10 Additional Tests
5. OPERATIONS REQUIREMENTS
5.1 Demonstrated Quality Control Program
5.2 Facilities and Procedures Audit (F&PA)
5.3 Manufacturer's Responsibilities
5.4 Manufacturing and Production Tests
APPENDIX A: UNITS OF MEASUREMENT
APPENDIX B: APPROVAL MARKS
APPENDIX C: VISCOSITY-TEMPERATURE PLOT
| DocumentType |
Standard
|
| PublisherName |
Factory Mutual Research Corporation
|
| Status |
Current
|