CEI EN 61850-7-420 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
|
BS EN 61850-7-420:2009
|
Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes
|
IEC TR 61850-7-510:2012
|
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
|
IEC TR 62689-100:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 100: Requirements and proposals for the IEC 61850 series data model extensions to support fault passage indicators applications
|
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview
|
EN 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
|
EN 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
|
PD IEC/TR 61850-7-510:2012
|
Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines
|
17/30358470 DC : 0
|
BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
|
I.S. EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
|
12/30260040 DC : 0
|
BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION
|
IEEE C37.119-2005
|
IEEE Guide for Breaker Failure Protection of Power Circuit Breakers
|
IEC TR 61850-90-7:2013
|
Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems
|
BS EN 62271-3:2015
|
High-voltage switchgear and controlgear Digital interfaces based on IEC 61850
|
BS EN 61850-7-4:2010
|
Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes
|
PD IEC/TR 61850-1:2013
|
Communication networks and systems for power utility automation Introduction and overview
|
PD IEC/TR 62689-100:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes Requirements and proposals for the IEC 61850 series data model extensions to support fault passage indicators applications
|
12/30265386 DC : 0
|
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
|
15/30326344 DC : 0
|
BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
|
I.S. EN 61850-7-4:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
|
I.S. EN 61850-7-420:2009
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
|
CEI EN 61850-7-4 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
|
IEC 62270:2013
|
Guide for computer-based control for hydroelectric power plant automation
|
EN 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
|
PD IEC/TR 61850-90-7:2013
|
Communication networks and systems for power utility automation Object models for power converters in distributed energy resources (DER) systems
|
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
|
IEC 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
|
IEC 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
|
IEEE/IEC 1249-2013
|
IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
|
IEEE 2030.100-2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
|