IEC 62153-4-11:2009
Current
The latest, up-to-date edition.
Metallic communication cable test methods - Part 4-11: Electromagnetic compatibility (EMC) - Coupling attenuation or screening attenuation of patch cords, coaxial cable assemblies, pre-connectorized cables - Absorbing clamp method
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
07-08-2009
FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Test method
4.1 Equipment
4.1.1 General
4.1.2 Balun requirements
4.1.3 Test head and extension cable requirements
4.1.4 Impedance matching
4.2 Test sample
4.2.1 Length of the patch cords under test
4.2.2 Length of extension cables connected to patch
cord under test
4.2.3 Tested length
4.2.4 Preparation of extension cable and test head
4.3 Calibration procedure
4.4 Test set-up
4.4.1 General
4.4.2 Test set-up verification
4.5 Measuring procedure
5 Expression of test results
6 Test report
6.1 General
6.2 Evaluation of test results
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.