IEEE C37.115-2003
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
IEEE Standard Test Method for Use in the Evaluation of Message Communications Between Intelligent Electronic Devices in an Integrated Substation Protection, Control and Data Acquisition System
17-10-2023
30-06-2004
1. Overview
1.1 Scope
1.2 Purpose
1.3 Document organization
2. References
3. Definitions and acronyms
3.1 Definitions
3.2 Acronyms and abbreviations
4. Communication network structures
4.1 Substation LAN architecture
4.2 Utility enterprise WAN architecture
5. Network management and application development tools
5.1 Network analyzer
5.2 Network management stations
5.3 Monitoring software
5.4 Server-based databases
6. Communication test method
6.1 Functional and performance requirements
6.2 Test concepts and requirements
Annex A (informative) Bibliography
A.1 Modeling tools
A.2 Text books
A.3 EPRI reports
A.4 CIGRE reports
A.5 IEEE technical reports, papers, standards, and
draft standards
A.6 IEC and ISO/IEC specifications
A.7 RFC specifications
Annex B (informative) Synch check to close breaker
B.1 Performance requirements
B.2 Evaluation criteria
B.3 Functional configuration
B.3.1 Overview
B.3.2 Communication configuration
B.3.3 Allocation of functions
B.4 Object model
B.4.1 Remote operation
B.4.2 Substation operation
B.5 Transaction sequences
B.5.1 Operator-initiated select for breaker close
B.5.2 Operator-initiated permissive close
B.5.3 Select synch check parameters, VTs, and Synch
Check Relay
B.5.4 Initiate synch check
B.5.5 Check for dead line or dead bus
B.5.6 Check for high-voltage difference
B.5.7 Perform synch check
B.5.8 Update Remote Controller
Annex C (informative) Load tap changer control with remote
voltage measurements
C.1 Performance requirements
C.2 Evaluation criteria
C.3 Functional configuration
C.4 Object model
C.4.1 Remote operations
C.4.2 Internal substation operation
C.5 Transaction sequences
C.5.1 System configuration engineer selects remote
Load Center VT
C.5.2 Substation host initializes Load Center VT input
to TCCR
C.5.3 System configuration engineer sets operating
parameters
C.5.4 Tap changer control operations
C.5.5 Alarm generation
Annex D (informative) Distributed generation on utility feeders
D.1 Performance requirements
D.2 Functional configuration
D.3 Object model
D.3.1 Communication interface object model
D.3.2 Human interface components
D.3.3 Power system components
D.4 Transaction sequences
D.4.1 System configuration
D.4.2 System operation
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.