MIL-C-14242 Revision B Notice 2 - Validation:2019
Current
The latest, up-to-date edition.
Cable Assembly, Fuze Control
English
24-06-2019
This specification covers the following electrical cable assemblies for bomb fuze control: M48(T8), M49(T15), M50(T16), M71(T26), M73(T27), M72(T32), and M73C.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.