NAVSEA S9074 AR GIB 010/278 : 0
Current
The latest, up-to-date edition.
REQUIREMENTS FOR FABRICATION WELDING AND INSPECTION, AND CASTING INSPECTION AND REPAIR FOR MACHINERY, PIPING, AND PRESSURE VESSELS
Hardcopy
English
01-01-1995
1. SCOPE
2. REFERENCED DOCUMENTS
3. GENERAL REQUIREMENTS
4. QUALITY ASSURANCE AND QUALIFICATION PROVISIONS
5. MATERIALS
6. WELDING REQUIREMENTS AND CONTROLS
7. WORKMANSHIP REQUIREMENTS
8. POST WELD HEAT TREATMENT
9. DESIGN REQUIREMENTS FOR WELDED JOINTS
10. INSPECTION REQUIREMENTS
11. ALLIED PROCESSES
12. CASTING INSPECTION
13. REPAIR OF CASTINGS
14. NDT REQUIREMENTS FOR TURBINE PARTS
15. NDT INSPECTION REQUIREMENTS FOR PROPULSION REDUCTION
GEARS AND STEAM TURBINE DRIVEN AUXILIARY GEARS
16. NDT INSPECTION REQUIREMENTS FOR FORCED DRAFT BLOWERS
17. NOTES
Appendix A Additional requirements for welding titanium and
titanium alloys
Tables 1 - 23
Figures 1 - 4
Gives the welding and allied processes (excluding brazing) for and casting requirements including inspection for the fabrication, alteration or repair of any item or component of machinery, piping, and pressure vessels in ships of the United States Navy.
| DocumentType |
Standard
|
| Pages |
162
|
| PublisherName |
Naval Sea Systems Command
|
| Status |
Current
|
| Supersedes |