Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NEN EN 13146-5 : 2012

Current

Current

The latest, up-to-date edition.

RAILWAY APPLICATIONS - TRACK - TEST METHODS FOR FASTENING SYSTEMS - PART 5: DETERMINATION OF ELECTRICAL RESISTANCE

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Terms and definitions, symbols and abbreviations
  3.1 Terms and definitions
  3.2 Symbols and abbreviations
4 Principle
5 Apparatus
  5.1 Rail
  5.2 Water
  5.3 Spray equipment
  5.4 Electricity supply
  5.5 instruments
6 Test specimens
7 Procedure
8 Calculations
9 Test report
Annex A (informative) Resistance/time plot

Defines a laboratory test procedure for determining the electrical resistance, in wet conditions, between the running rails provided by a fastening system fitted to a steel or concrete sleeper, bearer or element of slab track.

DocumentType
Standard
PublisherName
Netherlands Standards
Status
Current

Standards Relationship
BS EN 13146-5:2012 Identical
NBN EN 13146-5 : 2012 Identical
EN 13146-5:2012 Equivalent
NS EN 13146-5 : 2012 AC 2017 Identical
I.S. EN 13146-5:2012 Identical
NF EN 13146-5 : 2012 Identical
DIN EN 13146-5:2012-06 Identical
UNE-EN 13146-5:2017 Identical

Sorry this product is not available in your region.