Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NFP 98 744-6 : 2009

Current

Current

The latest, up-to-date edition.

ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 6: ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS ASPHALT DOSING APPARATUS

Published date

12-01-2013

Sorry this product is not available in your region.

Avant-propos
1 Domaine d'application
2 Références normatives
3 Termes et définitions
4 Principe
5 Appareillage
6 Mode opératoire
  6.1 Opération préalable
  6.2 Essai élémentaire
  6.3 Calibrage ou vérification d'un compteur à liant
      hydrocarboné
  6.4 Calibrage ou vérification d'un compteur à liant
      hydrocarboné sur un chantier
7 Validité des essais
8 Rapport d'essai

Le présent document spécifie les méthodes pour effectuer: le calibrage ou la vérification sur chantier d'un compteur à bitume volumétrique ou massique.

DevelopmentNote
Indice de classement: P98-744-6. PR NFP 98 744-6 September 2002. (11/2002) PR NFP 98 744-6 October 2007. (10/2007)
DocumentType
Standard
PublisherName
Association Francaise de Normalisation
Status
Current

NFP 98 728-2 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 2 : BITUMINOUS MIXTURE DISCONTINUOUS MODE PRODUCTION FACILITIES
XP P98 772-2 : 2004 XP ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULES FOR GRANULAR MIX FABRICATION PLANTS - DESCRIPTION AND FUNCTIONAL SPECIFICATIONS - PART 2: DISCONTINUOUS PRODUCTION MODULE
NFP 98 772-2 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULE FOR GRANULAR MIXTURE PRODUCTION PLANTS - DESCRIPTION AND FUNCTIONAL REQUIREMENTS - PART 2: MODULE FOR DISCONTINUOUS PRODUCTION
NFP 98 772-1 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULE FOR GRANULAR MIXTURE PRODUCTION PLANTS - DESCRIPTION AND FUNCTIONAL REQUIREMENTS - PART 1: MODULE FOR CONTINUOUS PRODUCTION
NFP 98 728-1 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 1: BITUMINOUS MIXTURE CONTINUOUS MODE PRODUCTION FACILITIES

NFP 98 724 : 1991 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - BITUMINOUS BINDER MEASURING DEVICES - TEST BENCH AND METHODS

Sorry this product is not available in your region.