PD CLC/TR 50126-3:2008
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Railway applications. The specification and demonstration of reliability, availability, maintainability and safety (RAMS) Guide to the application of EN 50126-1 for rolling stock RAM
Hardcopy , PDF
10-05-2024
English
30-09-2008
Introduction
1 Scope
2 Definitions
3 Approach adopted for the Guide
3.1 General
3.2 Entities Involved In the Life Cycle Phases of Rolling Stock
4 Application of this Guide
4.1 Object of the application
4.2 Application of EN 50126-1
4.2.1 Assessment of the application of EN 50126-1
4.2.2 Mandatory requirements for the application of EN 50126-1
5 Specifying RAM requirements
5.1 Introduction
5.2 Preliminary RAM analysis
5.2.1 General
5.2.2 Preliminary RAM Analysis activities
5.2.2.1 General
5.2.2.2 System Identification
5.2.2.3 Breakdown structure and boundary limits
5.2.2.4 Failure Conditions
5.3 RAM requirements
5.3.1 Introduction
5.3.2 Reliability Targets
5.3.3 Maintainability Targets
5.3.3.1 Generic Qualitative Requirements for
Maintainability
5.3.3.2 Preventive/Corrective Maintenance Requirements
5.3.3.3 Logistic Support Requirements
5.3.3.4 Maintenance Cost Requirements
5.3.4 Availability Targets
5.4 Process for choosing RAM figures
5.5 RAM Programme
5.5.1 Introduction
5.5.2 Configuration Management System
5.5.3 RAM Programme Outline
5.5.4 Example of RAM Analyses Document Template and Data
5.5.4.1 Introduction
5.5.4.2 Common Data for the analyses
5.5.4.3 Reliability Prediction Analysis Template and
Data Sheets
5.5.4.4 Maintenance Attributes (Maintenance Levels,
Skill Level and LRU definition)
5.5.4.5 Preventive Maintenance Analysis Template and
Data Sheets
5.5.4.6 Corrective Maintenance Analysis Template and
Data Sheets
5.5.4.7 Failure Mode Effects and Criticality Analysis
Template and Data Sheets
6 RAM Assurance during Life Cycle
6.1 RAM Programme and Phases of the Life Cycle
6.1.1 Introduction
6.1.2 Tender Phase
6.1.3 Design Phase
6.1.4 Demonstration Phase
6.1.4.1 Introduction
6.1.4.2 RAM Acceptance Criteria
6.1.4.3 In service checking Period
6.1.4.4 Data Report from field and its organisation
7 RAM Parameters to be incorporated into LCC Model
7.1 Introduction
7.2 Overview of LCC Modelling
7.3 RAM parameters for LCC
Annex A - Examples of breakdown structure
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.