Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

RSSB GE/GN8628 : ISSUE 1

Current

Current

The latest, up-to-date edition.

GUIDANCE ON PREPARATION FOR AND OPERATION DURING WINTER

Published date

17-09-2013

Sorry this product is not available in your region.

Part 1 - Introduction
Part 2 - Guidance on Weather Forecasts
Part 3 - Planning for Winter
Part 4 - Guidance on Winterisation of Infrastructure
Part 5 - Guidance on Winterisation of Rolling Stock
Part 6 - Guidance on Operational arrangements in Winter
Appendix A - Recommended Timeline for Winter Preparation
Appendix B - Guidance on Air Systems
Appendix C - Guidance on Brake Systems
Appendix D - Guidance on Coupler Reliability
Abbreviations
Definitions
References

Provides guidance on the preparation of infrastructure and rolling stock for winter and their subsequent operation during frost, ice and snow conditions on the Great Britain (GB) mainline railway.

DocumentType
Standard
PublisherName
Rail Safety and Standards Board Limited
Status
Current

BS EN 590 : 2013 AUTOMOTIVE FUELS - DIESEL - REQUIREMENTS AND TEST METHODS

Sorry this product is not available in your region.