RSSB GE/GN8628 : ISSUE 1
Current
The latest, up-to-date edition.
GUIDANCE ON PREPARATION FOR AND OPERATION DURING WINTER
17-09-2013
Part 1 - Introduction
Part 2 - Guidance on Weather Forecasts
Part 3 - Planning for Winter
Part 4 - Guidance on Winterisation of Infrastructure
Part 5 - Guidance on Winterisation of Rolling Stock
Part 6 - Guidance on Operational arrangements in Winter
Appendix A - Recommended Timeline for Winter Preparation
Appendix B - Guidance on Air Systems
Appendix C - Guidance on Brake Systems
Appendix D - Guidance on Coupler Reliability
Abbreviations
Definitions
References
Provides guidance on the preparation of infrastructure and rolling stock for winter and their subsequent operation during frost, ice and snow conditions on the Great Britain (GB) mainline railway.
| DocumentType |
Standard
|
| PublisherName |
Rail Safety and Standards Board Limited
|
| Status |
Current
|
| BS EN 590 : 2013 | AUTOMOTIVE FUELS - DIESEL - REQUIREMENTS AND TEST METHODS |