Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

RSSB GK/RT0051 : ISSUE 1

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SINGLE LINE CONTROL

Published date

17-09-2013

Superseded date

01-09-2013

Superseded by

RSSB GK/RT0077 : ISSUE 1

Sorry this product is not available in your region.

Part A
Issue Record
Responsibilities
Compliance
Health and Safety Responsibilities
Supply
Part B - Introduction
1 Purpose
2 Scope
3 Definitions
4 Application
5 Summary of Systems
Part C - Absolute Block, Interlocked System
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossings
11 System Failures
Part D - Tokenless Block System
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossings
11 System Failures
Part E - Electric Token Systems
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossings
11 System Failures
Part F - No Signaller Token, Remote System
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossings
11 System Failures
Part G - One-train Staff System
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossings
11 System Failures
Part H - One-train System Without Staff
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 Permissive and Shunt Working
8 Switching Out of Signal Boxes
9 Ground Frames
10 Level Crossing
11 System Failures
Part J - Train Out of Section Proving
1 Purpose
2 Scope
3 Definitions
4 Application
5 Principles of Operation
6 System Requirements
7 System Failures
Part K - References

Describes the signalling requirements to ensure the safe movement of trains on single lines and equivalent bi-directional lines.

DevelopmentNote
Superseded by RSSB GK/RT0055 and RSSB GK/RT0077.
DocumentType
Standard
PublisherName
Rail Safety and Standards Board Limited
Status
Superseded
SupersededBy

RSSB GK/RT0009 : ISSUE 4 IDENTIFICATION OF SIGNALLING AND RELATED EQUIPMENT

Sorry this product is not available in your region.