Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

RSSB GM/GN2607 : ISSUE 1

Current

Current

The latest, up-to-date edition.

GUIDANCE ON THE BRAKING REQUIREMENTS FOR HAULING UNBRAKED MULTIPLE UNITS IN FREIGHT TRAINS

Published date

17-09-2013

Sorry this product is not available in your region.

Part 1 - Introduction
Part 2 - Hauling Multiple Units in Freight Trains
Part 3 - Composition and Marshalling of the Freight Train
Part 4 - Determining Available Brake Performance
Part 5 - Gradient Restrictions on Train Formations
Part 6 - Freight Train Division Scenarios and Braking Performance
Part 7 - Multiple Unit Temporary Through Brake Pipe
Part 8 - Static Brake Tests
Part 9 - Operational Procedures
Appendix A - Determining the Brake Performance for Operation on Gradients
Definitions
References

Gives additional guidance where a multiple unit, consisting of four or more vehicles, is to be moved in its dedicated freight train and that they will not be marshalled into a longer general freight train formation.

DocumentType
Standard
PublisherName
Rail Safety and Standards Board Limited
Status
Current

BS EN 15220-1 : 2008 RAILWAY APPLICATIONS - BRAKE INDICATORS - PART 1: PNEUMATICALLY OPERATED BRAKE INDICATORS
EN 15807:2011 Railway applications - Pneumatic half couplings
UIC 540 : 6ED 2014 BRAKES - AIR BRAKES FOR FREIGHT TRAINS AND PASSENGER TRAINS

Sorry this product is not available in your region.