Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

S.R. CLC/TS 50549-2:2015

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

REQUIREMENTS FOR GENERATING PLANTS TO BE CONNECTED IN PARALLEL WITH DISTRIBUTION NETWORKS - PART 2: CONNECTION TO A MV DISTRIBUTION NETWORK

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2015

Superseded date

01-02-2022

$177.62
Including GST where applicable
Summarise this standard

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Requirements on generating plants
5 Conformance test procedure
Annex A (informative) - Interconnection requirements
Annex B (informative) - Remote information exchange
Annex C (informative) - Frequency stabilizing services
Annex D (informative) - Loss of Mains and overall power
        system security
Annex E (informative) - Examples of protection strategies
Annex F (normative) - Abbreviations
Bibliography

Defines technical guidance on the requirements for generating plants which can be operated in parallel with a distribution network.

DocumentType
Standard
Pages
60
PublisherName
National Standards Authority of Ireland
Status
Superseded
SupersededBy

Standards Relationship
CLC/TS 50549-2:2015 Identical

⚠

A newer version of this standard is available.

View Current Edition
$177.62
Including GST where applicable