Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

VDI 4505 Blatt 1:1997-03

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Project management - Methodical transaction of projects for industrial plants and equipment

Available format(s)

Hardcopy , PDF

Language(s)

German

Published date

01-03-1997

Withdrawn date

02-07-2024

$153.69
Including GST where applicable

Vorwort
1 Zielsetzung und Einleitung
2 Grundlagen der Abwicklungsmethodik
3 Vorbereitung der Auftragsabwicklung
  3.1 Einleitung der Auftragsabwicklung
  3.2 Übergabe an den Projektleiter
  3.3 Auftragsprüfung und -risikoanalyse
  3.4 Vertrag/Auftragsbestätigung
4 Auftragsabwicklung
  4.1 Kick-Off-Meeting und Team-Bildung
  4.2 Planung der Auftragsabwicklung,
       technisch/kaufmännisch
  4.3 Qualitätssicherung, Dokumentation
  4.4 Fortschrittskontrolle/-Steuerung
  4.5 Kostenkontrolle/-steuerung
  4.6 Engineering/Konstruktion, Dienstleistungen
  4.7 Beschaffung/Eigenfertigung
  4.8 Verpackung und Versand
  4.9 Bau und Montage
  4.10 Schulung und Inbetriebnahme
  4.11 Garantienachweis/Übernahme/Gewährleistung
  4.12 Auftragsanalyse
5 Zusammenfassung
  5.1 Praktische Nutzbarkeit der Richtlinie
  5.2 Auftragsabwicklung - Personelle Anforderungen
  5.3 Auftragsabwicklung im Umfeld der Geschäftsprozesse
Literaturhinweise
Stichwortverzeichnis

DocumentType
Standard
Pages
18
PublisherName
Verlag des Vereins Deutscher Ingenieure
Status
Withdrawn
Supersedes

VDI 4501 Blatt 2:2008-12 Occupational field Technical Sales - Curriculum and study content for the qualification of sales engineers

$153.69
Including GST where applicable