BS 5192-4:1993
Current
The latest, up-to-date edition.
Guide to production control Dispatching (shop-floor control)
Hardcopy , PDF
English
05-15-1993
Committees responsible
Foreword
Guide
Introduction
1 Scope
2 References
3 Definitions
4 Dispatching
5 Shop order documentation
6 Provision of resources
7 Dispatching systems
8 Computer based production modelling
9 Control
Figures
1 Stages of production control
2 Shop-floor documentation
3 Due-date filing despatching system
4 Scheduling system of despatching
5 Line of balance
Table
1 Example of an input/output record
List of references
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.