10437-2
Current
Safe Work Method Statement - Skylight-Whirlybird Installation SWMS 10437-2
Word
English
04-01-2021
This Safe Work Method Statement (SWMS) covers hazards and controls associated with installing skylights and whirlybirds.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
Asbestos disturbance
Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
| DocumentType |
Misc Product
|
| Pages |
13
|
| ProductNote |
Skylight-Whirlybird Installation SWMS - written by SafetyCulture Pty Ltd.
It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template. You should add your company details, ABN and include your site specific details or risks to make it specific to the job at hand. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications. Note you will require MS Word to use this template. |
| PublisherName |
SafetyCulture Pty Ltd
|
| Status |
Current
|
| SupersededBy |
Job Steps Covered in Skylight/Whirlybird Installation SWMS:
(includes potential hazards & control measures)
Implement a Falls Emergency Rescue Plan
Working Outdoors
Arrival On-site & Assess On-site Conditions
Work Area Set-up
Environment
Housekeeping
Manual Tasks
Asbestos
Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
Cut Out of Internal Material as Required
Installing Skylight or Whirlybird on the Roof
Working with Powered & Non-powered Tools
Hazardous Chemical Use (e.g. silicone, cleaning solutions)
On Completion
Emergency Response
Version 2