API 10B-2 : 2013
|
RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS
|
API 2A WSD : 2014
|
PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN
|
API 10B-3 : 2016
|
TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION
|
API TR 10TR1 : 2008
|
CEMENT SHEATH EVALUATION
|
API 5CT : 2012
|
CASING AND TUBING
|
API TR 6AF2 : 2013
|
TECHNICAL REPORT ON CAPABILITIES OF API INTEGRAL FLANGES UNDER COMBINATION OF LOADING - PHASE 2
|
API TR 6AF1 : 1998
|
TECHNICAL REPORT ON TEMPERATURE DERATING ON API FLANGES UNDER COMBINATION OF LOADING
|
API 6A : 2010
|
SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT
|
API 14A : 2015
|
SPECIFICATION FOR SUBSURFACE SAFETY VALVE EQUIPMENT
|
NACE TM 01 77 : 2016
|
LABORATORY TESTING OF METALS FOR RESISTANCE TO SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING IN H[2]S ENVIRONMENTS
|
API 10A : 2011
|
SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING
|
API 2RD : 2013
|
DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS
|
API 65 : 2002
|
CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS
|
ISO 28781:2010
|
Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment
|
API RP 16Q : 2017
|
DESIGN, SELECTION, OPERATION, AND MAINTENANCE OF MARINE DRILLING RISER SYSTEMS
|
API RP 14B : 2015
|
DESIGN, INSTALLATION, OPERATION, TEST, AND REDRESS OF SUBSURFACE SAFETY VALVE SYSTEMS
|
API 5C3 : 1994
|
BULLETIN ON FORMULAS AND CALCULATIONS FOR CASING, TUBING, DRILL PIPE AND LINE PIPE PROPERTIES
|
API SPEC 11D1 : 2015
|
PACKERS AND BRIDGE PLUGS
|
API RP 13B-2 : 2014
|
RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS
|
ISO 10432:2004
|
Petroleum and natural gas industries Downhole equipment Subsurface safety valve equipment
|
API 8B : 2014
|
RECOMMENDED PRACTICE FOR PROCEDURES FOR INSPECTIONS, MAINTENANCE, REPAIR, AND REMANUFACTURE OF HOISTING EQUIPMENT
|
API 2INT-DG : 2007
|
INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS
|
API 6AF : 2008
|
TECHNICAL REPORT ON CAPABILITIES OF API FLANGES UNDER COMBINATIONS OF LOAD
|
CFR 30(PTS200-699) : JUL 2017
|
MINERAL RESOURCES - DEPARTMENT OF THE INTERIOR
|
ISO 10426-6:2008
|
Petroleum and natural gas industries — Cements and materials for well cementing — Part 6: Methods for determining the static gel strength of cement formulations
|
API 10TR4 : 2008
|
SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS
|
API 53 : 2012
|
BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS
|
API 17H : 2013
|
REMOTELY OPERATED TOOLS AND INTERFACES ON SUBSEA PRODUCTION SYSTEMS
|
API 2INT-MET : 2007
|
INTERIM GUIDANCE ON HURRICANE CONDITIONS IN THE GULF OF MEXICO
|
API 17D : 2011
|
DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT
|
API 5C5 : 2017
|
PROCEDURES FOR TESTING CASING AND TUBING CONNECTIONS
|
NORSOK D 010 : 2013
|
WELL INTEGRITY IN DRILLING AND WELL OPERATIONS
|
API TR 17TR3 : 2004
|
AN EVALUATION OF THE RISKS AND BENEFITS OF PENETRATIONS IN SUBSEA WELLHEADS BELOW THE BOP STACK
|
API 1111 : 2015
|
DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE OF OFFSHORE HYDROCARBON PIPELINES (LIMIT STATE DESIGN)
|