AITC 200 : 2009
Withdrawn
Withdrawn
MANUFACTURING QUALITY CONTROL SYSTEMS MANUAL
Published date
01-12-2013
Withdrawn date
03-06-2025
Sorry this product is not available in your region.
Details requirements for quality control in accordance with the ANSI/AITC A190.1 - 1992. Laminators quality control system and inspection of plant quality control system by AITC Inspection Bureau are detailed. Topics addressed are personnel, equipment and facilities, quality control of production operations, testing and inspection requirements, test procedures, AITC tests, definitions and annexes. Recommended for manufacturers of glued laminated timber, third party testing and inspection agencies, and quality assurance agencies.
| DocumentType |
Standard
|
| PublisherName |
American Institute of Timber Construction
|
| Status |
Withdrawn
|
| ICC 2012 INTERNATIONAL BUILDING CODE : 2012 | INTERNATIONAL BUILDING CODE |
| ICC IBC CODE AND COMMENTARY VOLUME 2 : 2015 | IBC® Code and Commentary, Volume 2 |
| ICC IBC INTERNATIONAL BUILDING CODE:2021 | International Building Code |
Summarise
Sorry this product is not available in your region.