AS/NZS 1554.7:2006
Superseded
View Superseded by
Structural steel welding Welding of sheet steel structures
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
12-14-2006
05-23-2024
Proposes requirements for the arc welding of steel structures made up of combinations of steel plate, sheet or sections, including pipe, hollow sections and built-up sections (collectively referred to herein as sheet steels) up to 4.8mm in thickness.
| Committee |
WD-003
|
| DocumentType |
Standard
|
| ISBN |
0 7337 7906 9
|
| Pages |
86
|
| PublisherName |
Standards Australia
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes | |
| UnderRevision |
This Standard specifies requirements for the arc welding of steel structures made up of combinations of steel plate, sheet or sections, including pipe, hollow sections and built-up sections (collectively referred to herein as sheet steels) up to 4.8 mm in thickness by the following processes:(a) Manual metal-arc welding (MMAW).(b) Submerged arc welding (SAW).(c) Gas metal-arc welding (GMAW or MIG), including pulsed mode.(d) Gas tungsten-arc welding (GTAW or TIG).(e) Flux-cored arc welding (FCAW).The Standard is limited to the welding of steel parent material with a specified minimum yield strength not exceeding 550 MPa.
First published as AS/NZS 1554.7:2006.
A newer version of this standard is available.
View Current Edition