AS/NZS 2891.1.1:2013
Current
Methods of sampling and testing asphalt Sampling - Loose asphalt
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
07-10-2013
This Standard sets out procedures for obtaining samples of loose asphalt using manual or mechanical methods and includes sampling from stockpiles. The Standard also specifies methods for the preparation of bulk samples to produce test portions ready for testing.
| Committee |
CE-006
|
| DocumentType |
Standard
|
| ISBN |
978 1 74342 535 0
|
| Pages |
12
|
| PublisherName |
Standards Australia
|
| Status |
Current
|
| Supersedes |
This Standard sets out procedures for obtaining samples of loose asphalt using manual or mechanical methods and includes sampling from stockpiles.The Standard also specifies methods for the preparation of bulk samples to produce test portions ready for testing. It does not include methods of sampling asphalt from a road pavement, whether compacted or not.NOTE: Guidance on the principles of obtaining samples of asphalt is given in Appendix A.
Originated in Australia as AS 2891.1-1986.
Previous edition AS 2891.1.1-2008.
Jointly revised and designated as AS/NZS 2891.1.1:2013.