1 - AS/NZS 3788:1996 PRESSURE EQUIPMENT - IN-SERVICE INSPECTION
4 - PREFACE
6 - CONTENTS
8 - SECTION 1 SCOPE AND GENERAL
8 - 1.1 SCOPE
8 - 1.2 APPLICATION
10 - 1.3 REFERENCED AND RELATED DOCUMENTS
10 - 1.3.1 Referenced documents
10 - 1.3.2 Related documents
10 - 1.4 DEFINITIONS
10 - 1.4.1 Alter
10 - 1.4.2 Boiler management system
10 - 1.4.3 Commissioning
10 - 1.4.4 Competent person
10 - 1.4.5 Dangerous occurrence
10 - 1.4.6 Defect
10 - 1.4.7 Hazard level
10 - 1.4.8 In-service inspection body
10 - 1.4.9 In-service inspector
10 - 1.4.10 Life assessment terms
11 - 1.4.11 Low-temperature vessels
11 - 1.4.12 May
11 - 1.4.13 Operate
11 - 1.4.14 Owner
11 - 1.4.15 Parties concerned
11 - 1.4.16 Pressure equipment
11 - 1.4.17 Pressures
11 - 1.4.18 Regulatory authority
11 - 1.4.19 Repair
11 - 1.4.20 Shall
11 - 1.4.21 Should
11 - 1.4.22 Space, confined
11 - 1.4.23 Use
11 - 1.4.24 Wastage
12 - 1.5 RISK MANAGEMENT
12 - 1.6 SAFETY
12 - 1.7 METHODS OF INSPECTION
12 - 1.8 SPECIAL CONDITIONS AND VARIATIONS
12 - 1.9 ALTERNATIVE STANDARDS
13 - SECTION 2 BASIC FEATURES OF INSPECTION
13 - 2.1 OBJECTIVES OF INSPECTION
13 - 2.2 ELEMENTS OF INSPECTION
13 - 2.3 STAGES OF INSPECTION
14 - 2.4 INSPECTION PROCESS
15 - SECTION 3 INSPECTION PERSONNEL AND ADMINISTRATION
15 - 3.1 OWNER'S RESPONSIBILITIES
15 - 3.2 IN-SERVICE INSPECTORS
15 - 3.3 OWNER INSPECTION SYSTEM
15 - 3.3.1 Requirements
16 - 3.4 SUPPORT ORGANIZATIONS
17 - SECTION 4 PRESSURE EQUIPMENT INSPECTION
17 - 4.1 GENERAL
17 - 4.2 COMMISSIONING OR RECOMMISSIONING INSPECTION
17 - 4.3 OPERATING SURVEILLANCE
18 - 4.4 PERIODIC INSPECTION
18 - 4.4.1 General
18 - 4.4.2 First in-service inspection
18 - 4.4.3 Frequency of periodic inspection
27 - 4.4.4 Preparation and planning
27 - 4.5 INSPECTION OF IDLE PRESSURE EQUIPMENT
27 - 4.6 PRESSURE-RELIEF DEVICES
27 - 4.6.1 General
28 - 4.6.2 Installation
28 - 4.6.3 Security of operation
28 - 4.6.4 In-service visual inspection
28 - 4.6.5 Valve maintenance or repairs
28 - 4.6.6 Spring-loaded, pilot-operated and dead weight pressure-relief valves
29 - 4.6.7 Bursting discs
30 - 4.6.8 Rupture pin valves (Buckling pin non-reclosing pressure relief device)
30 - 4.6.9 Fusible plugs
30 - 4.7 CONTROLS CRITICAL FOR SAFEGUARDING EQUIPMENT
30 - 4.7.1 Pressure-actuated devices
30 - 4.7.2 Temperature-actuated devices
30 - 4.7.3 Excess flow valves
30 - 4.7.4 Quick-actuating closure interlocks and swing bolt doors
30 - 4.7.5 Relief valve isolation interlocks
30 - 4.8 INSTRUMENTATION AND CONTROLS
31 - 4.9 EMERGENCY SHUTDOWN SYSTEMS
31 - 4.10 AUTOMATIC FIREFIGHTING SYSTEMS USED TO PROTECT PRESSURE EQUIPMENT
31 - 4.11 LOW TEMPERATURE VESSELS
31 - 4.11.1 Vacuum-insulated vessels
31 - 4.11.2 Insulated, non-vacuum, non-jacketed vessels
31 - 4.11.3 Transportable vessels
32 - SECTION 5 ASSESSMENT OF PRESSURE EQUIPMENT INTEGRITY
32 - 5.1 GENERAL
32 - 5.1.1 Scope of section
32 - 5.1.2 Responsibility
32 - 5.1.3 Documentation
32 - 5.2 ACCEPTANCE CRITERIA OF DEFECTS
32 - 5.2.1 Introduction
33 - 5.2.2 Initial review
33 - 5.2.3 Investigation of defects
33 - 5.2.4 Thinning of walls
34 - 5.2.5 Cracking
35 - 5.2.6 Planar type weld defects
35 - 5.2.7 Volume type weld defects
35 - 5.2.8 Dents
35 - 5.2.9 Metallurgically damaged material
36 - 5.2.10 Leakage
36 - 5.2.11 Bulging
36 - 5.3 DETERMINATION OF SAFE REMAINING LIFE
36 - 5.3.1 General
36 - 5.3.2 Investigation Method
37 - 5.3.3 Fatigue
37 - 5.3.4 Creep
38 - 5.3.5 Combined creep and fatigue
38 - 5.3.6 Wastage
38 - 5.3.7 Combined creep, fatigue and wastage
39 - 5.3.8 Review of design life of pressure equipment of advanced design and construction
39 - 5.3.9 Inspection prior to end of safe life
39 - 5.4 DETERMINATION OF MAXIMUM ALLOWABLE WORKING PRESSURE
39 - 5.4.1 Introduction
39 - 5.4.2 Presence of defects
40 - 5.4.3 Changed operating conditions
40 - 5.5 RELATED DOCUMENTS
41 - SECTION 6 REPAIRS, ALTERATIONS AND RE-RATING
41 - 6.1 GENERAL
41 - 6.2 REPAIRS, REPLACEMENTS AND ALTERATIONS
41 - 6.2.1 Procedure and design
41 - 6.2.2 Minor repairs
42 - 6.2.3 Welder qualifications
42 - 6.2.4 Inspection
42 - 6.3 RE-RATING
43 - SECTION 7 INVESTIGATION OF DETERIORATION AND FAILURES
43 - 7.1 GENERAL
43 - 7.2 FAILURE ANALYSIS
43 - 7.2.1 General
43 - 7.2.2 Failure analysis data
44 - 7.3 REPORTING OF INCIDENTS AND FAILURES
49 - SECTION 8 DOCUMENTATION AND RECORDS
49 - 8.1 GENERAL
49 - 8.2 PRESSURE EQUIPMENT REGISTER
49 - 8.3 PRESSURE EQUIPMENT DATA
50 - 8.4 PRESSURE EQUIPMENT HISTORY
50 - 8.5 PRESSURE PIPING
51 - APPENDIX A - LIST OF REFERENCED DOCUMENTS
55 - APPENDIX B - RISK MANAGEMENT
55 - B1 GENERAL
55 - B2 RISK ANALYSIS AND MANAGEMENT TECHNIQUES
55 - B2.1 Hazard survey
55 - B2.2 Hazard and operability study
55 - B2.3 Reliability study
55 - B2.4 System reliability and fault tree analysis
55 - B2.5 Consequence analysis
55 - B2.6 Risk assessment
55 - B3 AUDITS
56 - B4 USE OF RISK MANAGEMENT
57 - APPENDIX C - SAFETY DURING INSPECTION
57 - C1 GENERAL
57 - C2 HAZARDOUS SUBSTANCES
57 - C3 INSPECTION EQUIPMENT
57 - C4 SAFETY AND PROTECTIVE EQUIPMENT
58 - C5 ISOLATION AND TAGGING
60 - APPENDIX D - METHODS OF NSPECTION
60 - D1 SCOPE
60 - D2 METHODS
60 - D3 DOCUMENTATION
60 - D4 SURFACE PREPARATION
60 - D5 COMPETENCE
60 - D6 VISUAL EXAMINATION
60 - D6.1 General
60 - D6.2 External visual examination
61 - D6.3 Internal visual examination
62 - D7 THICKNESS TESTING
62 - D8 RADIOGRAPHIC EXAMINATION
62 - D9 ULTRASONIC EXAMINATION
62 - D10 MAGNETIC PARTICLE EXAMINATION
62 - D11 PENETRANT EXAMINATION
63 - D12 INFRARED THERMOGRAPHY
63 - D13 OTHER NON-DESTRUCTIVE EXAMINATION METHODS
63 - D14 METALLURGICAL TESTING
63 - D14.1 Material identification
63 - D14.2 Hardness
64 - D14.3 Microscopy and replication
64 - D15 HYDROSTATIC PRESSURE TEST
64 - D15.1 General
64 - D15.2 Test pressure
64 - D15.3 Test medium
64 - D15.4 Test temperature
65 - D15.5 Hydrostatic test procedure
65 - D15.6 Reporting of results
66 - D16 PNEUMATIC PRESSURE TEST
66 - D16.1 Application
66 - D16.2 General precautions
67 - D16.3 Examination of welds
67 - D16.4 Test temperature
67 - D16.5 Test pressure
68 - D16.6 Test procedure
68 - D16.7 Reporting of results
68 - D17 COMBINED HYDROSTATIC/PNEUMATIC TEST
69 - D18 LEAK TESTING
69 - D18.1 General
69 - D18.2 Pneumatic leak testing of low temperature vessels
69 - D19 DESTRUCTIVE TESTING
69 - D20 INSPECTION OF INTERNAL LININGS
71 - APPENDIX E - INSPECTION AND REPAIR OF TRANSPORTABLE VESSELS
71 - E1 GENERAL
71 - E2 MATERIALS OF CONSTRUCTION
72 - E3 INSPECTION
72 - E3.1 Inspection frequency
72 - E3.2 Visual examination
74 - E3.3 Non-destructive examination
76 - E3.4 Ancillary equipment
76 - E4 REPAIRS, ALTERATION AND RERATING OF TRANSPORTABLE VESSELS
76 - E4.1 General
76 - E4.2 Repairs
77 - E4.3 Non-destructive examination
77 - E4.4 Repair after accident
77 - E4.5 Postweld heat treatment
78 - APPENDIX F - INSPECTION OF BOILERS
78 - F1 PRE-SHUTDOWN INSPECTION
78 - F2 SHUTDOWN PROCEDURE
78 - F3 PREPARATION FOR SHUTDOWN INSPECTION
79 - F4 SHUTDOWN INSPECTION
80 - F5 INSPECTION OF BOILER MANAGEMENT SYSTEMS
80 - F6 INSPECTION DURING RECOMMISSIONING
80 - F7 BOILER ANCILLARY EQUIPMENT
80 - F8 REPORT
81 - APPENDIX G -INSPECTION OF UNFIRED PRESSURE VESSELS - STATIONARY
81 - G1 GENERAL
81 - G2 AIR RECEIVERS
81 - G3 PRESSURIZED STORAGE VESSELS
81 - G4 LP GAS STORAGE VESSELS
82 - G5 PROCESS VESSELS
82 - G6 AUXILIARY VESSELS
82 - G7 AUTOCLAVES
82 - G8 REPORT
83 - APPENDIX H - INSPECTION OF HEAT EXCHANGERS, COOLERS AND CONDENSERS
83 - H1 GENERAL
83 - H2 SHELL AND TUBE HEAT EXCHANGERS
83 - H3 AIR-COOLED HEAT EXCHANGERS
84 - H4 PLATE HEAT EXCHANGERS
85 - APPENDIX I - INSPECTION OF PRESSURE PIPING
85 - I1 GENERAL
85 - I2 PIPING OF HAZARD LEVELS A AND B
85 - I3 POSSIBLE MODES OF FAILURE
86 - I4 INSPECTION PERIODS
86 - I5 DATA AND HISTORY RECORDS
86 - I5.1 Data
87 - I5.2 History records
87 - I6 INSPECTION
87 - I6.1 General external visual inspection
88 - I6.2 Inspection during operation and shutdown
89 - I6.3 Inspection during outage and start-up
89 - I7 NON-DESTRUCTIVE EXAMINATION
91 - I8 THE EFFECTS OF CREEP AND THERMAL FATIGUE ON PIPING
91 - I8.1 Creep
91 - I8.2 Thermal fatigue
91 - I8.3 Combined creep and thermal fatigue
93 - APPENDIX J - INSPECTION OF FIRED HEATERS
93 - J1 GENERAL
93 - J2 INSPECTION OF PRESSURE COMPONENTS
94 - J3 INSPECTION OF FIRESIDE COMPONENTS
94 - J4 EXTERNAL INSPECTION
94 - J5 TESTING
95 - APPENDIX K - TYPICAL INSPECTION REPORTS IN ACCORDANCE WITH AS 3788
97 - APPENDIX L - PRESERVATION AND INSPECTION OF IDLE PRESSURE EQUIPMENT
97 - L1 GENERAL
97 - L2 DECOMMISSIONING
97 - L3 EXTERNAL INSPECTION
97 - L4 PRESERVATION PROCEDURE
98 - L5 MONITORING OF PRESSURE EQUIPMENT STANDING IDLE
98 - L6 RECOMMISSIONING
99 - APPENDIX M - COMMON MODES AND CAUSES OF DETERIORATION AND FAILURE
99 - M1 GENERAL
99 - M2 CORROSION
99 - M2.1 Groups of corrosion
99 - M2.2 Forms of corrosion
100 - M3 HYDROGEN BLISTERING
101 - M4 HYDROGEN SULFIDE CRACKING
101 - M5 FATIGUE
101 - M6 DISTORTION BY OVERHEATING
101 - M7 CREEP
101 - M8 EMBRITTLEMENT
102 - M9 OVERPRESSURIZATION
102 - M10 OVERLOADING
102 - M11 EARTHQUAKES, EARTH SETTLEMENT AND WIND LOADING
102 - M12 MECHANICAL DAMAGE
102 - M13 EROSION
102 - M13.1 Internal
102 - M13.2 External
106 - APPENDIX N - ASSESSMENT OF LOCALIZED WALL THINNING OF CYLINDRICAL, CONICAL, AND SPHERICAL SHELLS
106 - N1 GENERAL
106 - N2 NOTATION
107 - N3 ASSESSMENT PROCEDURE
107 - N3.1 Method
107 - N3.2 Definition of thinned area
107 - N3.3 Minimum calculated thickness
108 - N3.4 Characteristic shell length
108 - N3.5 Mean thickness of trapezoidal patches
109 - N3.6 Acceptability of thinning
109 - N4 ALLOWABLE MINIMUM THICKNESS
110 - N5 TREATMENT OF THINNED AREAS
110 - N6 EXAMPLE OF ASSESSMENT OF LOCALLY THINNED WALL
110 - N6.1 Problem
110 - N6.2 Example with no weld in thinned area
112 - N6.2 Example with weld in thinned area
116 - APPENDIX O - ASSESSMENT OF PLANAR DEFECTS
116 - O1 GENERAL
116 - O2 NOTATION
117 - O3 CRITICAL CRACK SIZE
120 - O4 CRACK GROWTH DUE TO FATIGUE
121 - O5 SAFETY FACTORS
121 - O6 FURTHER CONSIDERATIONS
121 - O7 EXAMPLES OF APPLICATION OF SIMPLIFIED FRACTURE MECHANICS FOR ASSESSING CRACK-LIKE DEFECTS
121 - O7.1 Definition of problem
122 - O7.2 Calculation of critical crack size
127 - APPENDIX P - TYPICAL MAINTENANCE REPORT - PRESSURE-RELIEF VALVES
128 - APPENDIX Q - INSPECTION OF PRESSURE EQUIPMENT WITH QUICK-ACTUATING CLOSURES AND SWING BOLT DOORS
128 - Q1 INSPECTION
128 - Q2 RECORDS
129 - APPENDIX R - EXTERNAL INSPECTION OF BURIED OR MOUNDED PRESSURE VESSELS
129 - R1 EXTERNAL INSPECTION OF PRESSURE VESSELS WITHOUT CATHODIC PROTECTION
129 - R2 EXTERNAL INSPECTION OF PRESSURE VESSELS WITH CATHODIC PROTECTION
129 - R3 RECORDS
130 - APPENDIX S - INSPECTION OF DEAERATORS
130 - S1 GENERAL
130 - S2 INSPECTION AND REPAIR
130 - S3 RELATED DOCUMENT
131 - APPENDIX T - INSPECTION OF STORAGE TANKS TO ANSI/API 620 OR EQUIVALENT
131 - T1 SCOPE
131 - T2 AMBIENT TEMPERATURE AND HEATED TANKS
131 - T3 LOW TEMPERATURE STORAGE TANKS
131 - T3.1 Internal inspection of low temperature storage tanks
132 - T3.2 External inspection of low temperature storage tanks
132 - T4 RELATED DOCUMENTS
134 - APPENDIX U - COST EFFECTIVE REMAINING LIFE ASSESSMENT
134 - U1 BACKGROUND
134 - U2 FACTORS AFFECTING REMAINING LIFE
134 - U3 THREE STAGE REMAINING LIFE ASSESSMENT
136 - U4 WORKED EXAMPLE OF A THREE-STAGE REMAINING LIFE ASSESSMENT
140 - APPENDIX V - KEY COMPETENCIES FOR IN-SERVICE INSPECTORS
141 - APPENDIX W - INSPECTION OF DRUMS FOR TRANSPORT OF LIQUEFIED GAS
141 - W1 APPLICATION
141 - W2 PERIODIC INSPECTION AND TESTING
141 - W3 EXTERNAL EXAMINATION
141 - W3.1 General
141 - W3.2 Bulge
141 - W3.3 Burn
141 - W3.4 Dents
142 - W3.5 Cuts and gouges
142 - W3.6 Isolated pits
142 - W3.7 Chain pitting and line corrosion
143 - W3.8 General corrosion
143 - W3.9 Gas leakage
144 - W3.10 Fire damage
144 - W4 INTERNAL EXAMINATION
144 - W5 CLEANING
144 - W6 WEIGHTING
144 - W7 MARKING
144 - W8 RECORDING
145 - W9 PLUGS AND VALVES
146 - APPENDIX X - TESTING OF SOFT SEATED POP ACTION RELIEF VALVES FOR LIQUEFIABLE GAS SERVICE
146 - X1 GENERAL
146 - X2 PRESSURE GAUGES
146 - X3 TEST PROCEDURE
146 - X4 PASS/FAIL CRITERIA