• Shopping Cart
    There are no items in your cart

ASME PTC 47.1:2017

Superseded

Superseded

View Superseded by

CRYOGENIC AIR SEPARATION UNIT OF AN INTEGRATED GASIFICATION COMBINED CYCLE POWER PLANT

Available format(s)

PDF

Language(s)

English

Published date

05-31-2018

Superseded date

01-10-2024

US$155.25
Excluding Tax where applicable

Notice
Foreword
Committee Roster
Correspondence With the PTC Committee
Introduction
Section 1 - Object and Scope
Section 2 - Definitions and Description of Terms
Section 3 - Guiding Principles
Section 4 - Instruments and Methods of Measurement
Section 5 - Calculations and Results
Section 6 - Report of Results
Section 7 - Uncertainty Analysis
Nonmandatory Appendices
A - Sample Calculation
B - Sample Uncertainty Analysis

This Code applies to ASUs of any size, in either a single-train or multitrain configuration.

DocumentType
Standard
ISBN
9780791872017
Pages
91
PublisherName
American Society of Mechanical Engineers
Status
Superseded
SupersededBy

ASME PTC19.1 : 2013 TEST UNCERTAINTY
ASME PTC1 : 2015 General Instructions (PTC 1 - 2015)<br>
ASME PTC19.3 : 1974(R2004) PERFORMANCE TEST CODE - PART 3: TEMPERATURE MEASUREMENT
ASME MFC 3M : 2004 MEASUREMENT OF FLUID FLOW IN PIPES USING ORIFICE, NOZZLE, AND VENTURI
ASME PTC 47 : 2006 INTEGRATED GASIFICATION COMBINED CYCLE POWER GENERATION PLANTS

US$155.25
Excluding Tax where applicable