BIS IS 2911-2 : 1980(R2010)
Superseded
Superseded
View Superseded by
CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - PART 2: TIMBER PILES
Published date
01-12-2013
Publisher
Superseded date
11-03-2021
Superseded by
Sorry this product is not available in your region.
0. FOREWORD
1. SCOPE
2. TERMINOLOGY
3. NECESSARY INFORMATION
4. EQUIPMENT AND ACCESSORIES
5. DESIGN CONSIDERATIONS
6. CLASSIFICATION
7. TIMBER SPECIES
8. PRESERVATIVE TREATMENT
9. WORKING AND DRIVING STRESSES
10. DESIGN OF PILE CAP (RCC)
11. CUTOFFS AND THEIR TREATMENT
12. CONTROL OF PILE DRIVING
13. RECORDING OF DATA
14. STORING AND HANDLING
Specifies the design and construction of timber piles used either for load bearing or for the compaction of ground.
| Committee |
CED 43
|
| DocumentType |
Standard
|
| PublisherName |
Bureau of Indian Standards
|
| Status |
Superseded
|
| SupersededBy |
| BIS IS 2911-4 : 2013 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 4: LOAD TEST ON PILES |
Summarise
Sorry this product is not available in your region.