BIS IS 2911-3 : 1980 AMD 4 2014
Superseded
Superseded
View Superseded by
CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - PART 3: UNDER-REAMED PILES
Published date
01-12-2013
Publisher
Superseded date
01-21-2022
Superseded by
Sorry this product is not available in your region.
0. FOREWORD
1. SCOPE
2. TERMINOLOGY
3. NECESSARY INFORMATION
4. MATERIALS
5. DESIGN CONSIDERATIONS
6. EQUIPMENT AND ACCESSORIES
7. CONSTRUCTION
APPENDIX A - DEGREE OF EXPANSIVENESS
APPENDIX B - SAFE LOAD ON UNDER-REAMED
PILES
APPENDIX C - MODULUS OF SUBGRADE
APPENDIX D - EQUIPMENT FOR UNDER-REAMED
PILES (MANUAL CONSTRUCTION)
APPENDIX E - BASIC PROPERTIES OF DRILLING
MUD (BENTONITE)
Specifies the design and construction of under-reamed piles having one or more bulb(s) formed along the stem.
| Committee |
CED 43
|
| DocumentType |
Standard
|
| PublisherName |
Bureau of Indian Standards
|
| Status |
Superseded
|
| SupersededBy |
| BIS IS 2911-1-4 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 4: PRECAST CONCRETE PILES IN PREBORED HOLES |
| BIS IS 2911-1-3 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 3: DRIVEN PRECAST CONCRETE PILES |
| BIS IS 2911-1-1 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 1: DRIVEN CAST IN-SITU CONCRETE PILES |
| BIS IS 2911-4 : 2013 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 4: LOAD TEST ON PILES |
| BIS IS 2911-1-2 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 2: BORED CAST IN-SITU CONCRETE PILES |
Summarise
Sorry this product is not available in your region.