BS 5507-1:1977
Withdrawn
Methods of test for falsework equipment Floor centres
Hardcopy , PDF
English
08-31-1977
01-01-2021
Foreword
Cooperating organizations
Methods
1 Scope
2 References
3 Principles
4 Test arrangement and apparatus
5 Testing procedure
6 Interpretation
7 Test report
Appendices
A Checking previously used floor centres
B Basic considerations
C Uses of test report
Figures
1 Test 1 (for bending moment and deflection)
2 Test 2 (for shear and support forces)
3 Test 3 (for interaction forces at lapped joint)
4 Test 4 (for intermediate propping force)
5 Cross sections at loading points
6 Support details in tests 1, 2 and 3
Bending strength, deflection, shear strength at overlap, propping from below, checking of previously used units, test report. Does not include metallurgical examination.
| Committee |
B/514
|
| DevelopmentNote |
Supersedes 75/10230 DC & 85/10855 DC. (08/2005) Reviewed and confirmed by BSI, January 2010. (12/2009)
|
| DocumentType |
Standard
|
| Pages |
16
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| Standards | Relationship |
| UNE-EN 123300:1992 | Identical |
| 17/30349707 DC : DRAFT AUG 2017 | BS 5975:2018 - CODE OF PRACTICE FOR TEMPORARY WORKS PROCEDURES AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS 5975(2008) : 2008 | CODE OF PRACTICE FOR TEMPORARY WORKS PROCEDURES AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS DD89(1983) : 1983 | METHODS FOR TESTING AND ASSESSING THE PERFORMANCE OF PREFABRICATED HEAVY DUTY SUPPORT TOWERS |
| 07/30150912 DC : 0 | BS 5975 - CODE OF PRACTICE FOR THE PROCEDURAL CONTROL OF TEMPORARY WORKS AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS 5975:1982 | Code of practice for falsework |
| BS 5975:1996 | Code of practice for falsework |