BS 5760-14:1993
Withdrawn
View Superseded by
Reliability of systems, equipment and components Guide to formal design review
Hardcopy , PDF
English
10-15-1993
10-29-2018
Committees responsible
National foreword
Introduction
Guide
1. Scope
2. Normative references
3. Definitions
4. Application of formal design review
5. Management of the process
5.1 Policy statement
5.2 Precautions
6. Design reviews during life cycle phases
6.1 Types
6.2 General objectives
6.3 Specific objectives
7. Team composition and qualities
7.1 Common qualities
7.2 Specific considerations
7.3 Chairperson
7.4 Secretary
7.5 Specialists
7.6 Designers and developers
8. Planning and scheduling
8.1 Introduction
8.2 Timing
8.3 Schedule
9. Implementation
9.1 General
9.2 Notification and agenda
9.3 Input data
9.4 Topics
9.5 Conduct of formal design review meetings
9.6 Documentation
9.7 Follow-up
9.8 Legal approval
10. Role of specialists
10.1 All specialists
10.2 Individual specialists
Tables
1. Types of formal design reviews
2. Product life cycle phases and design review types
3. Team member responsibilities and schedule
4. Design review topics
Guidance on implementing design reviews and details the contributions of various specialists including reliability, maintainability, quality and product safety.
| Committee |
DS/1
|
| DevelopmentNote |
Also numbered as IEC 61160 (08/2005)
|
| DocumentType |
Standard
|
| Pages |
26
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| SupersededBy |
| Standards | Relationship |
| IEC 61160:1992 | Identical |
A newer version of this standard is available.